My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122542
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:32 PM
Creation date
11/25/2007 10:31:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Permit File
Doc Date
1/13/2000
Section_Exhibit Name
1996 Rule 2.05 Operations and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 2.05 <br />. Over the life of the mine, a total of 360,00 linear cubic yards of topsoil were salvaged and stockpiled. <br />Table 2.05-6 describes the topsoil stockpiles and topsoil replacement parameters. Topsoil StockpIle "C" <br />was not needed for final reclamation purposes and subsequently seeded in place with the "permanent" <br />seed mixture. <br />TABLE 2.05-6 <br />TOPSOIL STOCKPILE DATA* <br />Stockpile <br />Desi nation Volume <br />(Icy) Final Disposition <br />A 134,00 <br />0 Entire pile respread in 1986 onto final pit reclamation <br />B 1 14,00 <br />0 66,000 Icy removed for final pit reclamation; 48,000 Icy used for Shope/office <br />area final reclamation <br />C 7,500 Partially used for final reclamation of sho /office area; balance reclaimed in lace <br />D 93,000 Entire pile used for final it reclamation <br />E 11,000 Entire pile used for final pit reclamation <br /> 360,00 <br />0 <br />`Volumes taken from August 1986 permit revision <br />• In addition, some G83,000 yards of topsoil were stripped and duecdy replaced on regraded areas as part <br />of concurrent reclamation operations during mining. Table 2.05-7 shows material balances for topsoil <br />stripping and replacement operations. Data from the January ] 985 submittal indicates that a balance of <br />approximately 300,000 cubic yards of topsoil remained in the stockpiles a[ that time. <br />TABLE 2.05-7 <br />TOPSOIL REMOVAL & REPLACEMENT SCHEDULE* <br />Year Volume Stripped <br />Ibcy) Volume Replaced <br />Ibc 1 Volume Stockpiled <br />(6c ) <br />re-1983 682,585 434,993 247,592 <br />1983 61,320 61,320 0 <br />1984 83,690 102,703 0 <br />1985 105,190 51,546 ~ 53,644 <br />1986 0 37,785 Total 301,236 <br />1987 0 250,438 <br /> Total 932,785 Total 932,786 <br />*Data taken from January 1985 permit revision [Sec. 2.05.4f21fa11 <br />L J <br />2.05-7 Revised -11/28/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.