Laserfiche WebLink
<br /> <br />r <br />TABLE OF CONTENTS <br /> LIST OP TABLES <br /> LIST OP FIGURES <br /> INTRODUCTI06 <br /> PROJECT 9ISTORY <br /> PREVIOOS PILB DESIGN <br /> PRESENT DISPOSAL OPERATIONS <br /> REPORT PORPOSE <br /> SITE INVESTIGATION <br />• LABORATORY TESTING <br /> STORAGE OPTIMIZATION AND STABILITY ANALYSIS <br />~ RECOMMENDED CONSTRUCTION PROCEDURES <br /> INTERIM MET80D5 <br /> FINAL CONSTRUCTION PROCEDURES <br />• CLEARING STRIPPING AND SITE GRADING <br /> ROCK DRAIN <br /> COAL REPOSE PLACEMENT AND COMPACTION <br /> CRITICAL STAGES <br /> BYDROLOGIC CONTROL AND SUBSIDENCE MONITORING <br /> CONCLUSIONS AND SUMMARY <br /> REFERENCES <br /> TABLES <br />• FIGURES <br /> APPENDIX A - LABORATORY TEST RESULTS <br /> APPENDIX B - BORING LOGS <br />PEGS <br />1 <br />1 <br />1 <br />2 <br />3 <br />3 <br />4 <br />5 <br />8 <br />8 <br />9 <br />30 <br />11 <br />12 <br />14 <br />1~ <br />15 <br />