My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122284
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:22 PM
Creation date
11/25/2007 10:14:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006A
IBM Index Class Name
Permit File
Doc Date
5/17/2004
Section_Exhibit Name
Part 816 Surface Mining Activities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 816.461t1 Continued. <br />I• <br />occurs. The methods to be implemented to prevent deterioration of soil during storage <br />are fully described under Section 780.18 and Sections 816.21 of this application. <br />Upon removal of each sedimentation pond, the affected land will be regraded and <br />revegetated as required by 30 CFR 816.100-816.106 and 816.111-816.117 and as <br />described in detail under Section 780.18 of this application. <br />Ponds A, B, D, and E are existing sedimentation ponds. They contain water throughout <br />all or most of the year and typically have some established riparian vegetation. Kerr <br />proposes to retain Ponds A, D, and E as permanent impoundments. These ponds would <br />be used as stock ponds for livestock grazing and would continue to be used as small <br />impoundments for wildlife use and habitat as they have since 1979. Both livestock <br />grazing and wildlife habitat are components of the proposed postmining rangeland use. <br />Pond A was created by constructing an embankment across an existing natural drainage <br />to impound intermittent flows and disturbed area runoff from the southern portion of the <br />. current permit area and adjacent areas. <br />Pond B was created by excavating a depression in an existing ephemeral drainage <br />channel and constructing a low embankment of sufficient size to retain the required <br />volume of runoff from a portion of the disturbed area. Originally this pond did not retain <br />water year-round, however, recently it began retaining sufficient water to support <br />willows within the impoundment basin. Kerr proposes to partially breach the Pond B <br />embankment and allow the area to continue filling with sediment to create a riparian <br />area. <br />Ponds D and E were created by constructing embankments at the outlet of small existing <br />natural impoundments in order to increase the retention capacity for disturbed area <br />runoff. These ponds contain water year-round. <br />816-61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.