My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122276
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:22 PM
Creation date
11/25/2007 10:14:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Permit File
Doc Date
6/4/1996
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOZER COST 8 PERFORMANCE DATA WORKSHEET <br />Machine Make 8 Model: Cat DBN <br />Dozer Blade: SEMI-UNIVERSAL <br />Attachment #1: ROPS Cab <br />Attachment #2: <br />Last Cost Revision: April, 1995 <br />BASE EQUIPMENT COSTS (CRG) <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Lost Guide (CECG) <br />3) Colorado Contractors Association <br />Wage Rate Schedule <br />4) Caterpillar Performance Handbook <br />~-~~---~---- Base Ownership 8 Overhaul Costs ---~~-----~-~-~------~---~-- Base Operating Costs --------------- <br />~ Ownership ~ Overhaul ~ Field Repair ~ <br />~ Depreciation CFC Overhead ~ Labor Parts Labor Parts ~ Fuel Lube Tires G.E.L. <br />Machine 516.90 58.78 56.52 54.63 511.53 55.14 59.27 59.91 53.23 50.00 51.55 <br />Attachment #1 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attachment #2 53.40 51.06 50.79 50.77 51.33 51.41 51.11 50.00 50.29 50.00 50.93 <br />CDST ADJUSTMENT FACTORS (CECG) <br />Factor Description Base Value Adj. Value Multiplier <br />Acquisition cost: 5355.510 .00 5286.425 .52 0.806 <br />Eton. life hrs.-machine: 13. 245 10. 455 1.267 <br />attach. #1: 11. DDo 11. 000 1.DOo <br />-attach. #2: 8. 200 8. 200 1.000 <br />Annual use hours: 2. 112 1. 525 1.385 <br />Mechanic's labor cost: (27 .15 523 .32 0.859 <br />Fuel cost/gal.-gasoline: f1 . 15 51 .15 1.000 <br />-diesel: 50 .94 50 .94 1.000 <br />Cube cost: 13 .23 33 .23 1.000 <br />Tire life hours: 0 0 1.000 <br />Tire factor: 0 0 1.000 <br />Tire cost: 50 .00 50 .00 1.000 <br />ADJUSTED EQUIPMENT COSTS <br />ACQUISITION COST BREAKDOWN <br />Cost Elements (CECG) Factor Adj. Cost <br />Base purchase price 5:155 .510 .00 <br />Less dealer discount 0.100 :35 .551. 00 <br />Plus freight 0.020 57 ,110. 20 <br />Plus dealer charges* 0.005 51 ,771. 55 <br />*MLRD estimate -~--- ----- --- <br />Adjusted purchase price S:i28 .846. 75 <br />Plus taxes: Sales @ 3% 59 .865. 40 <br /> SMM (a2X 56 ,576. 94 <br />Less tire cost 50. 00 <br />Less salvage value 0.179 :58. 863. 57 <br />Net acquisition cost 5:'86.425.52 <br /> ~---- ~~--~~ Adjusted Ownership 8 Overhaul Costs -~ ~-~--~-~~ -~--~-- ----- Adjusted Operating Costs ---~-- ------- <br />Acquisition cost 516.36 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Econ.life -Dozer 8 ROPS 520.72 N/A N/A 55.87 (14.61 56.51 (11.74 N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 50.98 51.68 51.79 51.41 N/A N/A N/A N/A <br />Annual usage 522.65 513.63 510.12 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts (16.99 56.81 55.06 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple shifts 515.11 54.54 53.37 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech.labor-Dozer 8 ROPS N/A N/A N/A 55.04 N/A 55.59 N/A N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 50.84 N/A 51.53 N/A N/A N/A N/A N/A <br />Fuel/lube -Dozer 8 ROPS N/A N/A N/A N/A N/A N/A N/A 59.91 53.23 50.00 51.55 <br />-Attach. #2 N/A N/A N/A N/A N/A N/A N/A 50.00 50.29 50.00 50.93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.