Laserfiche WebLink
<br />Table Continued <br /> Unit Cost Cost <br />As ect Reclamation O eration uantit Units $ $ <br />G. Settling Basin <br /> 1. Will fill with roundwater <br />H. Access Road <br /> 1. To remain followin reclamation <br />I. Topsoil and Overburden Stockpiles <br /> I. Material removed for other <br /> Aspects <br /> 2. Seed and mulch 3.7 Ac 800 2,960 <br /> 3. Reseed 20% 0.7 Ac 800 560 <br />J. Employee Facilities and Maintenance <br /> Station <br /> 1. Scarify compacted ground 0.5 Ac 50 25 <br /> 2. Replace topsoil, 6" x 0.5 acres 400 CY 1.25 500 <br /> 3. Seed and mulch 0.5 Ac 800 400 <br /> 4. Reseed 20% 0.5 Ac 800 400 <br />K. Asphalt, Concrete and Processing <br /> Plants <br /> 1. Remove electrical lines (any 1 L.S. 2000 2000 <br /> foundations remaining will be <br /> under water <br />Total Disturbance Costs 203,152 <br />Contractor Mobilization/Demobilization (8%) 0.08 16,252 <br />Overhead (18.5%) 0.185 40,590 <br />Administration 5% 0.05 13,000 <br />Total Pro osed Financial Warrant 272,994 <br />Disturbed Acreage 40.0 <br />Financial Warrant er Acre 6,825 <br />