Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 183 <br />Date : 09/04/2003 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or otherjob action :Minor Revision 29 <br />Task description :Replace Topsoil from Stockpile to Light Use Roads <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.07 NA <br /> Operating cosUhour : $93.97 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $31.83 NA <br /> Total unit costlhour : $176.87 Total fleet cosUhour : $176.87 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,400 CCY factor : 1.125 volume : 1,575 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />; <br />HOURLY PRODUCTION .. <br />Jab Condition Correction Factors <br />Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />5.00 % (I <br />5.200 feet <br />2,550 Ibs/LCY <br />Operator skill : 0.75 <br />Material wnsistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.41 <br />Adjusted unit production <br />Adjusted fleet production <br />284.00 <br />284.00 <br />(fnd-rfJ <br />(Cat HB) <br />(Caf HB) <br />(Cat HB) <br />(S/SU/U) <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.55 Hours <br />Unit cost : $0.623 /LCY Total job cost : $981 <br />PermiUjob# : C-96-083 <br />Abbreviation :none <br />Filename :C083-183 <br />