Laserfiche WebLink
LIST OF EXHIBITS <br />• <br />r~ <br />L_J <br />I• <br />Exhibit No <br />13-1 Facilities Map <br />13-2 Surface Hydrology Map -Mine Area <br />13-2A Surface Hydrology Map - II-W South <br />13-3 Surface Water Control Plan -Tie-Across Haul Road <br />13-4 Watershed Boundary Partial <br />13-5 Proposed Sedimentation Pond 005 <br />13-5A Pond 005 As-Built <br />13-6 Pond 006 Phase II As-Built <br />13-6A Pond 006 Phase IV Subwatershed Map <br />13-66 Pond 006 Phase IV Design <br />13-6C Pond 006 Phase IV Pre-Settling Basin Design <br />13-6D Pond 006 Phase V Subwatershed Map <br />13-7 Proposed Sedimentation Pond 009 <br />13-7A Sedimentation Pond 009 As-Built <br />13-8 Proposed Sedimentation Pond 015 12 sheets) <br />13-SA Proposed Sedimentation Pond 016 12 sheets) <br />13-8B Proposed Sedimentation Pond 017 12 sheets) <br />13-8PP Topsoil Stockpile PP Sumps PP-S1 and PP-S2 IAs-Built) <br />13-80.0. Topsoil Stockpile QQ Sump O.Q.-S1 (As-Builtl <br />13-8RR Topsoil Stockpile RR Sump RR-S1 IAs-Built) <br />13-9 Pond 15 As-Built <br />13-9A Pond 16 As-Built <br />13-10 Typical Road Details <br />13-11.1-11.8 Tie-Across Haul Road IAs-Built) <br />13-12.1-12.4 Mine Entrance Haul Road IAs-Built) <br />13-13.1-13.5 Haul Road AIAs-Built) <br />13-14.1-14.3 Haul Road B <br />13-15.1-15.2 Haul Road C <br />13-16.1-16.2 Reserved <br />13-17.1 Reserved <br />13-18.tA Haul Road FIAs-Builtl <br />13-19.tA-19.4A Haul Road GIAs-Builtl <br />13-20.tA Haul Road HIAs-Builtl <br />13-21.1 Plan and Profile, Haul Road I <br />13-21.1A Haul Road I (As-Built) <br />13-22.1 Plan and Profile, Haul Road J <br />13.22.1A Haul Road JIAs-Built) <br />13-23.1 Plan and Profile, Haul Road K <br />13-24.1 Proposed Haul Road L <br />TR-43 iii <br />Revised 2/03 <br />