Laserfiche WebLink
<br />I• <br />LIST OF TABLES <br />VOLUME I <br /> <br />• <br />TABLE NO. TABLE TITLE <br />TOC-6 <br />2.1-1 Equipment List <br />2.2-1 Construction and Disturbance Timing <br />2.5-1 ~ Surface and Ground Water Monitoring <br />2.5-2 I Water Quality Monitoring <br />3.3-1 Depth of Suitable Topsoil Material Available <br />3.3-4 Chemical Analysis of Surface Layer at Mine Site <br />3.4-1 ~ Big Sagebrush Shrubland Seed Mixture <br />3.4-2 i Loma Loadout Salt Tolerant Seed Mixture <br />3.7-2 Reclamation Schedule <br />3.9-1 I Reclamation Costs <br />3.9-2 ~ Calculation of Earthwork Volumes for Reclamation of Prelaw <br />Disturbance <br />3.9-3 ~ Hydrology Calculations for Reclamation of Prelaw Disturbance <br />3.9-4 ~ Stability Analysis of Prelaw Disturbance Reclamation <br />3.9-5 i Culvert Removal and Stream Channel Reconstruction <br />3.9-6 DMG Reclamation Costs <br />4.1-1 Test Pit T P 1 <br />4.1-2 Test Pit T P 2 <br />4.1-3 i Test Pit T P 3 <br />4.1-4 Test Pit T P 4 <br />4.1-5 Test Pit T P 5 <br />4.2-1 I Core Laboratories Analytical Report -Roof and Floor <br />4.2-2 Drill Hole Information Summary <br />4.2-3 I Coal Mine Waste Geochemical Data <br />4.3-1 ~ Coal Quality Data, Permit Area and Vicinity <br />4.3.2 I Surface Drilling Results In and Immediately Adjacent to Permit Area <br />4.4-1 Water Quality Analysis, By Sample Date, Alluvial Well No. 1 <br />4.4-2 Water Quality Analysis, By Sample Date, Alluvial Well No. 2 <br />4.4-3 i Water Quality Analysis, By Sample Date, Alluvial Well No. 4 <br />4.4-4 I Water Quality Analysis, By Sample Date, Alluvial Well No. 5 <br />4.4-5 ; Water Quality Analysis, By Sample Date, Alluvial Well No. 6 <br />M" <br />07/04 <br />