My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122154
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:17 PM
Creation date
11/25/2007 10:05:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Permit File
Doc Date
7/11/1995
Doc Name
REGULAR OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />map illustrates the existing and probable processing area setting. <br />However, the processing facilities may move if necessary in the affected <br />area to accommodate the operations. <br />Other than possible portable scales, it is not planned that any other <br />structures will be located on site. <br />Life of the Operation <br />It is estimated that about two or three acres will be disturbed per <br />year. On the basis of this rate of extraction, the life of the operation <br />is estimated to be approximately 12 to 18 years. However, the actual rate <br />of mining is based on market demands and subject to change accordingly. <br />Phases of Mining and Reclamation <br />It is anticipated that there will be two phases of the operation as <br />follows: <br />PHASES <br />Phase 1 - 33.94 +/- ac. (21.8 +/- ac. disturbed). <br />To be mined beginning in the fall of 1995 <br />for a period estimated to be about 7 to <br />11 years. Reclamation of this Phase to <br />begin upon commencement of operations in <br />Phase 2. <br />Phase 2 - 17.0 +/- ac. (13.8 +/- ac. disturbed). <br />To be mined over a period estimated to be <br />about 5 to 7 years. Reclamation of Phase 1 <br />to commence. Reclamation of Phase 2 to occur <br />upon completion of operations. <br />Concurrent Reclamation <br />Reclamation will occur in conjunction with the mining operation to the <br />extent practicable. The anticipated reclamation phasing plan is included <br />with the phases described above. However, because of the configuration of <br />the affected area, processing and stockpiling could remain in the same <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.