Laserfiche WebLink
iii iiiiiiiiiiiiiiii • <br />999 <br />• <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depart mem of Natural Resources <br />131 J Sherman SL. Ronm ? 15 <br />Dcnvcr, Colorado HO?OJ <br />Phone: IJOJI H6fi J56: <br />FA% 1)031 ftJ2-H106 <br />September 12, 1995 <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Mr. Isadore Mi 11 ion co~ern„r <br />Mi 11 ion Agricultural Investments Ltd IamesS Lochhexl <br />5951 St. Vrain Road exec~n~eD~re~ior <br />Longmont, CO 80503 nlichael H. LOng <br />Division Dueaor <br />Re: M-94-097, Spring Creek Gravel Pit, Permit Issuance <br />Dear Mr. Million: <br />On September 12, 1995, the Division of Minerals and Geology found Million <br />Agricultural Investments Ltd to have satisfied the applicable requirements of <br />C.R.S. 34-32-101 et s~ce for obtaining a mining and reclamation permit. <br />Therefore, a permit is being issued. Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use. Please read the terms of the permit. It is your responsibility <br />to comply with all of the terms of the permit. As a reminder, here are a few <br />things we feel are important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.10 pertains to <br />Amendments. Rule 1.9 to Technical Revisions. and Rule l.ll to Conversions. <br />3. On your permit anniversary date each year, September 12, you must submit <br />an annual fee and an annual report to us. The annual fee for this permit is <br />$550.00. Please consult Rule 1.15 for 110 and 112 Permits, and Statute <br />Section 34-32-116(1)(a> for 111 Permits, for the specific annual report <br />requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sin r <br />MICHAEL ~L@ G ~ <br />Division Directo~~~ <br />Enclosures <br />MBL/JD/amm/3508G <br />