Laserfiche WebLink
M� <br />' <br />• , <br />TYPICAL SECTIONAL ELEVATION OF POND E <br />SCALES H.I =10 V:I =5 EMBANKMENTS <br />TOP <br />10 YEAR <br />PONDING LIMI <br />TRASH RACK <br />AND ANTIVORTEX, <br />DEVICE, SEE DETAI <br />1 0.1 <br />T <br />SEDIMMUTIONDLEVEL�- -" <br />o WIDTH <br />SPILLWAY DESIGN �p <br />PONDING LEVEL w <br />W <br />cr <br />ILL <br />-- 00 <br />ELEVATION OF_ EMERGENCY <br />tELEVATION CREST SPILLWAY (WEIR OR CONDUIT) <br />ELEVATION � I <br />3 1 <br />3 <br />OF LOWEST <br />SET OF HOLES �ANTISEEP COLLARS AT <br />20' SPACING EXTENDING ONE <br />..PAST DAM <br />RISER DETAILS <br /><- - - -- 48" RISER o RISER <br />o11 <br />SIX SETS OF <br />0 4 -5" DIAMETER o SETS OF 4 -4" DIAMETER <br />HOLES EQUALLY w HOLES EQUALLY Wj <br />o SPACED AROUND PIPE j o SPACED AROUND PIPE Uj <br />NO. OF SETS VARIES j <br />0 0 <br />0 5' TYP. 0 2 0' TYP. <br />BOTTOM <br />�- 24" RISER <br />ONE OR TWO HOLES, <br />SIZE VARIES <br />o - - -- - - - -- a -- - - -HOL E <br />- - -- - - -- o- I - - - ELEVATION <br />.36" CONDUIT <br />18" CONDUIT <br />TYPE I TYPE 2 <br />18" CONDUIT <br />TYPE 3 <br />CONSTRUCTED <br />EMBANKMENT <br />HEIGHT <br />RIPRAP ENERGY <br />/ DISSIPATOR <br />00,0 e <br />000 0 <br />•0 0 <br />a.,e n <br />o <br />Top Plate <br />,C.M. Pipe Riser <br />N Opp <br />POND SCHEDULE <br />POND I.D. (a) g g C p E F G H KL/ M O P ;�' R/ A& T <br />Wes°w VOLUME (AF) 5"p D d• 3 /.O 5.3 20.3 ' /3.6 //• 5 5.3 5 / 0.8 3.9 <br />a <br />4.0 7.2 /. 3 O.3 2.1 3.5 0.3 <br />WW <br />WWH <br />� <br />ELEVATION (Ft) <br />c <br />LBb7.3 <br />6862.3 <br />6850,3 <br />68¢ #.9 <br />683 ?.0 <br />6828.5 <br />6966.2 <br />695 <br />68/5.6 <br />68/0.¢ <br />6762. <br />67�y <br />68¢¢0686. <br />9 9 <br />682 .0 <br />9 <br />76 ,/ <br />6 4 <br />69o0.3 <br />POND VOLUME (AF) <br />2/� <br />/.9 <br />2./ <br />23.7 <br />51.9 <br />312 <br />31,8 <br />/73 <br />2/./ <br />3.0 <br />/7.7 <br />8,2 <br />/3.8 <br />' /.� <br />7.7 <br />8,7 <br />OSM HEIGHT (U /S <br />16.o <br />3,7 <br />//• 3 <br />/G.5 <br />/O,O <br />14,1 <br />/2•3 <br />ZO,5 <br />14,3 <br />12.3 <br />14.1 <br />15 0 <br />B, 0 <br />Z Toe to Spiliwa ,Ft) <br />/95 <br />2.7 <br />8.3 <br />/0.2 <br />/4.7 <br />7.5 <br />/2.7 <br />w CONSTRUCTED (b <br />Z HEIGHT AT (Ft) <br />2 7 5 <br />J- 0 <br />!/ 7 <br />/4.6 <br />20.5 <br />/ /.O <br />/7.5 <br />/7.0 <br />Z3•/ <br />13.5 <br />17.9 <br />/B,¢ <br />3y2 <br />22.2 <br />23.2 <br />21•6 <br />2/.0 <br />CONSTRUCTED (6)69¢6.8 <br />/ /,2 <br />� CREST ELEV. (Ft) <br />M <br />6872,0 <br />686 y.2 <br />6858,¢ <br />68554 <br />6B4/.o <br />6838.2 <br />6976. <br />6973•/ <br />69ZQ.5 <br />6822.2 <br />676 y.9 <br />680 .2 <br />9 <br />6956.6 <br />6883.2 <br />68¢!•6 <br />w CREST <br />6776.0 <br />6908.2 <br />oLENGTH (Ft) <br />800 <br />550 <br />440 <br />/350 <br />/800 <br />2400 <br />1330 <br />400 <br />750 <br />350 <br />550 <br />/OZO <br />6¢O <br />520 <br />740 <br />860 <br />750 <br />4y0 <br />CL <br />TOP WIDTH (Ft) <br />12.0 <br />8.0 <br />9.3 <br />9.! <br />//./ <br />9.2 <br />10.5 <br />10.4 <br />11.6 <br />c/ 7 <br />10.6 <br />10.7 <br />/¢.B <br />/ /•¢ <br />11.6 <br />11-3 <br />11.2 <br />1F, 2 <br />w <br />TYPE OF RISER <br />/ <br />3 <br />3 <br />2 <br />2 1 <br />2 <br />2 <br />3 <br />-- <br />J <br />CREST <br />-- <br />3 <br />3_ <br />3 <br />3 <br />3 <br />~ <br />ELEVATION (Ft) <br />693F•5 <br />6868.8 <br />6865.6 <br />6853,7 <br />6860.4 <br />6836.56833.¢ <br />6972.56969.0682.068 <br />/8.3 <br />67E/•C <br />680¢.3 <br />(852.56879./ <br />6937­6 <br />61772.0 <br />690¢,7; <br />SIZE OF HOLES) <br />Q <br />(Inches) <br />-LOW- <br />5, oo <br />163,37 <br />/9 2.27 <br />4.00 <br />4,00 <br />4.00 <br />4.00 <br />2E44y <br />2 ¢.60 <br />/®2,94 <br />294.6'51 <br />®4.37 <br />2G)3•S <br />2 ®3.78 <br />/P3.92 <br />/Q¢.36 <br />29)A33 <br />493.7/ II <br />ELEVATION OF <br />EST SET OF HOLES(Ft) <br />6930.0 <br />867.3 <br />6862,3 <br />6850.3 <br />684¢,9 <br />6632,0 <br />6828.5 <br />6966.2 <br />6ySB•9 <br />69/56 <br />6810.4 <br />(0762.5" <br />6799.6 <br />6S¢¢,o <br />686y. y <br />6829.0 <br />6764./ <br />DESIGN <br />6900.3 <br />} <br />Q <br />FREQUENCY (Yrs) <br />/00 <br />ZS <br />26' <br />/00 <br />/00 <br />/00 <br />/00 <br />ZS <br />/00 <br />26' <br />26'" <br />26'" <br />/00 <br />26' <br />3 <br />CREST <br />ZS' <br />2 6' <br />z S' <br />NA <br />a <br />ELEVATION (Ft) <br />6939.0 <br />686¢.8 <br />6866.6 <br />6851.7 <br />68S/.f <br />6837.5 <br />6834.4 <br />6973.5 <br />6170.0 <br />682/ 9 <br />68/y.3 <br />6767.0 <br />6805.3 <br />6853.5 <br />6880.1 <br />6838.6 <br />6773.0 <br />CREST <br />s <br />i1/q <br />} <br />Z <br />LENGTH (Ft) <br />RCP <br />/S <br />/s <br />46' <br />70 <br />60 <br />SO <br />NA <br />60 <br />//O <br />20 <br />76' <br />36' <br />60 <br />6'10 <br />¢O <br />40 <br />60 <br />DESIGN DEPTH (Ft) <br />3.3 <br />0.90 <br />0.83 <br />/. 93 <br />2.00 <br />/.93 <br />/. 96 <br />/.00 <br />0.98 <br />086 <br />0.97 <br />092 <br />0.98 <br />0.98 <br />0.98 <br />0.95 <br />/.00 <br />NA <br />w <br />FREEBOARD (Ft) <br />2.7 <br />/./D <br />117 <br />/.07 <br />/.00 <br />/.07 <br />/./¢ <br />/03 <br />/OS <br />/.02 <br />/02 <br />/02 <br />/05 <br />/DD <br />IV JA <br />a) Reference E.F.C. Drawing, <br />Energy <br />Mines <br />No. <br />I a 2 Hydrology. <br />(b) Includes Manditory 5% Extra for Settlement. <br />(c) Includes 100% Sedimentation Volume and Routed 10 Year 24 Hour Flood Volume. <br />C.M. Pipe R <br />=TRASH RACK AND ANTIVORTEX <br />DEVICE DETAIL LSI ".l <br />DESIGN BY'SOIL CONSERVATION SERVICE Lug F', <br />SII /Z' --� <br />• inimum is cess. a. ,,,�. , t <br />I <br />24" DIAMETER PLAN <br />4 .- 7 <br />211/2 - -- <br />„ <br />I Plate S�5It„ - -5 a oa" Battle 5 -- - <br />?. vortex <br />EMERGENCY SPILLWAY DETAIL B 9 2Ss g,l•li -- 4 3/8" - -- - <br />5/e Stee - <br />-I- - - -- I` a +1431." BENDING DIAGRAM 2 ` -I -_ / <br />r -! . 14., <br />,> 253/• = • +r t�,�` _ i,y" FOR ©, ©a fORODS <br />857/ I -- ' - .r}r _♦L' tf• __ .Ia .i '___J, f - L--v , � �=• � I I " , s.s /B' G ------ -_ ) - -- - ' - -____ __ _ <br />For 48 l Device <br />Oae z7 ROD SCHEDULE <br />Y 12 s/t a e n r (Inside Radius) <br />-------- <br />� <br />- <br />i <br />. y <br />\;;reel Anti - vortex Baffle <br />Minimum Thickness 12 Gouge <br />ROD <br />I <br />I EE BOARD 27 "j - . -+- --- • - - - + -- ©" 12 <br />i <br />• ' :' ; . : � i _ -,I, ^Jrest of C.M. C <br />xL <br />12„ Pipe Riser <br />I ;44•L �4 "` <br />b <br />Radius 1/2" Dia. Cost <br />Lug Fasten n rs \ <br />i <br />' <br />205/16" <br />c <br />4 <br />DESIGN DEPTH 12 "I <br />4 Rod .5' Dio. With Threaded <br />d <br />25 3/8" <br />131/4" <br />i <br />t1 <br />SCALES Hrl =S t <br />11 OF 18 a RI 112' i Gouge of Pioe� 48 _ 30' Endc and Cast Lug Fasteners <br />- -� 27 <br />� ON 6 GRAVE <br />- <br />ROD <br />48" <br />1 24" <br />b <br />53" <br />205/16" <br />c <br />24 It <br />12" <br />d <br />25 3/8" <br />131/4" <br />f <br />36" <br />- <br />L BASE SECTIONAL ELEVATION A -A BENDING Dig-GRAM <br />V I"= 2 •• CONSTRUCTION DIAGRAM BENDING DIAGRAM FOR d RODS <br />t <br />{- -CREST LENGTH -- FOR ® RODS FOR (i) RODS <br />d' <br />I Indicates 24" RI ser dimension <br />• • • I NOTES 1. <br />WeldOb , O, and O rods to aO rods and weld ( rods to top plate. <br />•�•� •• _. 2. When de rods ore used, weld them to the 0 rods that ore perpendicular (or the two a <br />•" •, rods m t nearly perpendicular) to the an t- vortex baffle plate, <br />\ ; <br />DITCH 3. The trash rack may be fabricated in identical halves and attached to the baffle plate with <br />SCHEDULE ( V2 inch diameter U bolts spaced approximately 12 inches c -c along the vertical rind <br />✓ Tce inclined sections of the aO rods next to the plate. <br />I D2 El FI F2 GI HI KI LI <br />' - DITCH I.D. D. (b) <br />BI CI D L2 M I M 2 M 2 M 3 N I N 2 <br />DESIGN /O 0 /o /o /o UPPER LOWER (a) <br />N3 01 PI P2 Q1 RI R2 SL S2 FREQUENCY (Yrs) / <br />/00 /0 /O /00 /00 /00 /0 /0 /0 /O /00 /DO /O /O /DO /O /O /0 <br />'t DESIGN Q (CFS) /7 15 60 3 4 6 Z /55 /¢ 23S 13 2 75 100 200 2 24 12 23 122 196 S <br />2 49 Z/ <br />Z 2 4 Z 2 ¢ 4 ¢ Z 6 4- ¢ <br />¢ 2 2 2 2 2 4 4 Z 2 2 2 ¢ 2 <br />B 4 4 4- 4 4 4 ¢ 4, 4 4 <br />4 4 ¢ ¢ 4 4 4 4- 4 4- 4 4 4 4 4 <br />SLOPE --(Ft Ft) --. O.O// 0.03 0.015 0.0¢ O.O¢ 01 O/ 0.02 D•008 O.O/ O.O/ O.O/15 O.O/ O.O/5 O.O/ O.OD7 0.06 0,025 0.03- O.O/ O.O/ O.O/ O.O/5 0. 02 010 /5 •Oi O• 0/5" O/S <br />D (Ft) O, 96' 0.75 /. ¢ 0.38 O.4 0.65 0.42 2,2 /-0 2.3 0.85- O.6' 1155 0.2 <br />3•/ 0.3 0.95 0.65 /•/ 2,0 2.4 0.6 0.¢3 /•5 /•/5 /19 0.9 <br />VELOCITY (FPS) 2, 2 3.8 ¢.5 /.9 2•G /.4 /• O 4.5 2,5 S•3 2.0 0.5 ¢.7 S 5 6,C !.8 <br />4-1.5 3, 5 2.5 4.7 S 5 /• 7 / 2 <br />(a) Riprop Lining Required. (b)Reference E.F.C. Drawing, Energy.Mines No. 1 812 Hydrology. <br />X <br />I <br />1c� i <br />12 I - - - - -- - ;li = =- _ d � - - - I _Rod I12" Dia Mhef• Threaded <br />/s' Ends .md -'asr <br />Luq Fasteners <br />1/2" t Gauge of Pipe, 24" <br />SECTIONAL ELEVATION B -B <br />Varies <br />TFreeboard WS <br />f <br />Only use the design for Ponds C and T, which are <br />applicable for Twentymile Coal Company. The <br />design for the other ponds (8, D, E, F and 6) <br />have been updated with design contained in <br />other exhibits, or do not apply to Twentymile <br />(Ponds A, H, K, L, M, N, O, P, Q, R and 5). <br />TNrenlymile Coal Company <br />E,ldbit 8p <br />O, <br />Fc <br />9 <br />yl <br />I ! <br />I� D 41 <br />i Z Z <br />T it <br />TYPICAL DIMH SE'`CTION <br />SCALES H : I " = 5' V:1" = 2.5' 002610 <br />ENERGY FUELS CORPORATION <br />P L A T E I <br />IMENTA ION PO S <br />NERGY MINES NO. I a2. D <br />ECK AN PARK <br />DESIGNED-____ <br />j TRACED._. -_ <br />- <br />Denver CHECKED__.- __--- --_ - - -_ ' <br />JOB No 307 /EFC /01 _ I F;I -09- 9ifA3- 71_ <br />