Laserfiche WebLink
<br />iii iiiiiiiiiiiuiii • <br />:!"IBC LA.lD R~CL,~h9A71C~: ~~w.S.C.: <br />Departmem of Natural Resources <br />r3~3 Sherman SI.. Room 215 <br />Denver, CO 60203 <br />303 6663567 <br />RAx: 303 632-8706 <br />J ail L., iJl :..vi,:Jl~t iii t_, <br />~: <br />~~ J <br />~Ei P <br />a W?,i¢`9 <br />",. c <br />. ivy%• <br />.~= <br />rats <br />Roy Romer, <br />Gavemor <br />t 5 , 1992 Michael B. Long, <br />~ U g U 5 Divis,on D,renor <br />Mr. James Vanella <br />P.O. Bcx 35 <br />"lathrcp, CO 81236 <br />Re: M-42-045, Gold Basin Mine, Permit Issuance <br />Dear Mr. Vanella: <br />On July 21, 1992, the Mined Land Reclamation Division found James Vanella to <br />have satisfied the applicable requirements of C.R.S. 34-32-101 et seg. for <br />obtaining a mining and reclamation permit. Therefore, a permit 9s being <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed ~.~ith this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operaticn as a reference for operating personnel, to help ensure compliance <br />'with the terms or" the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We Suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisicn5, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, July 21, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />575.00. Please consult Rule 3.4 for 110 Pewits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerel , <br />MICHAEL L N <br />Division Director <br />MBL/WC'l/ern <br />Enclosures 8850G <br />