Laserfiche WebLink
<br />PEABODY COAL COMPANY -WESTERN DIVISION <br />MONITOR WELL CONSTRUCTION AND COMPLETION SUMMARY <br />~ine: Seneca 2 - W Monitor Well Name: ~ - ~-18-W <br />Location Coors: PLF 1/ 4. SW 1/4. 522, T5N, R83J _ <br />Ground S urface Elev: 7463.80 Total Depth: 402.5 ft. <br />Peabody Personnel: M. Koffler Driller: Winnek Drilling Co. <br />Type of Drilling: rotarv Drilling Fluid: water <br />Borehole Diameter:~ ~ 20 ft. 6.75 inch Completion Date: 9/30/87 <br /> ranainder 4.5 lnch <br />Well Construction Diagram ~ Completion Details <br />Depths <br />iop Lap . <br />Details <br />- o.o-, <br />6.0 _~ <br />_~ <br /> <br />Cement Grout ,• <br />"- <br />', <br />._ <br /> „~~ ,~_ <br />- <br /> :: <br />'~ . <br />- <br />i <br /> „ <br />: <br />,,,; ; <br />;~~ <br /> <br /> , <br /> ,_ <br /> ; <br /> -,-. :, <br /> ~ <br />Cuttings ~ ! <br />' <br />' <br /> `':i ~.' <br /> _;;, :'~ <br />blank ca <br />i ' " ' <br />s <br />ng •~,- <br />~ <br /> _;; ~,,. <br /> ' `~ <br />' <br /> ;:~ <br />; ; <br />_,,- <br />~ <br /> ~~, <br />_ ~_ <br />, <br />, <br /> , <br />~, <br />= _ <br /> , <br />' ~:, <br /> <br />- 200.0 <br />~ ~:; ,.,-; <br />- ~. <br />- <br /> ,.. ~~. <br />i JAS is%. <br />-260.0 _` _' ~' <br />.c <br />Bentonite pellet ' <br />hole plug <br />,' <o <br />-~. <br />- 300.0 rv ,a <br />- 383.5 <br />- 386.8 ~_ <br />- 387.8 <br />Well screen <br />ii _ <br />402.5- •._~. - <br />Casing Specs: Blank 2 inch schedule 80 pvc, flush threaded <br />Perforated 2 inch schedule 80 pvc, 4 colums of <br />horizontal mill slots with .02 - .025 inch openings <br />Blank Interval(s) 0 -387.8 ft. <br />Perforated Interval(s) 387.8 -402.5 ft. <br />Packer and/or Cement Basket Set At 2 packers set at 386.8 and 387.8 <br />Bentonite Seal From 260.0 ft. To <br />Cement Seal From 0.0 ft. To <br />Gravel Pack From 383.5 ft. To <br />Casing Height or MP Above Ground Surface <br />Additional Details~~iPtui in WadnP Coa] warn from 383.5 ft. <br />6.0 ft. <br />387.5 ft. <br />1.91 ft. <br />387.8 -402.5 <br /> <br /> <br />Development Summary WPI <br />additional air sumirx~ on 7/ I wac developed <br />19/88 and bailin by air surgiIlg on 10/1/87 with <br />g on 10/18/88. <br /> <br />Comments: hh al bail r loci in hole 9/1/88. <br />2 PACKERS <br />END CAP <br />8-26 <br />