Laserfiche WebLink
PEABODY COAL COMPANY - WESTERN DIVISION <br />MONITOR WELL CONSTRUCTION AND COMPLETION SUMMARY <br />~ 2 <br />W <br />S CiJ <br />0 <br />S2W <br />14 <br />ine: - <br />eneca Monitor Well - <br />- <br />- <br />Name: <br />Location Coors: NW'h,NE'/., S15,T5P1, R88W <br />Ground S urface Elev: 7258.90 Total Depth: 99 feet <br />Peabody Personnel: T .Smith Driller: Winnek Drilling Co. <br />Type of Drilling: rotary Drilling Fluid: water <br />Borehole Diameter: top 20 ft. 6.75 inch Completion Date: 9/5/87 <br /> remainder 4.5 inch <br />Well Construction Diagram <br />Depths Details <br />CEMENT i0P <br />GROUT cqp <br />0.0 - ~ `~ <br />3.5 <br />~ 3.0.__ <br />19.5 ..... <br />blank casing <br />44.0 - <br />50.0 - <br />Well Screen• <br />< 3/8 INCH _ <br />PEA GRAVEL <br />89.0 <br />END CA <br />00 <br />oa <br />o0 <br />0o ao <br />oe <br />oo° <br />ao 00 <br />00 <br />00 <br />00 <br />ao 00 <br />00 <br />00 <br />00 00 <br />ao <br />00 <br />00 oe <br />oe o0 <br />00 00 <br />ao <br />00 <br />00 00 <br />00 00 <br />00 00 <br />00 00 <br />00 <br />00 <br />00 -" oad <br />00 00 <br />oa _ o~ <br />000 <br />0o aoo <br />~- ooa <br />loo _ aea <br />00 ooa <br />00 <br />_ 00 <br />ua eoo <br />eo 00 <br />goo aoc <br />00 <br />_ ooa <br />00 00~ <br />0o as <br />00 00< <br />99.0 <br />100 - <br />Completion Details <br />Casing Specs: Blank 2 inch schedule 40 pvc. flush threaded <br />Perforated 2 inch schedule 40 Dvc, 4 colums of <br />horizontal mill slots with .02 - .025 inch openings <br />Blank Interval(s) 0-13 ft., 19.5 - 44.5 ft. and 89 to 99 ft. <br />Perforated Interval(s) 13 - 19.5 ft, and 44 - 89 ft. <br />Packer and/or Cement Basket Set At <br />Bentonite Seal From none To <br />Cement Seal From 0.0 ft. To 3.5 ft. <br />Gravel Pack From 3.5 ft_ To 99 ft_ <br />Casing Height or MP Above Ground Surface 2.50 ft. <br />Additional Details <br />Development Summary hell was developed by air sun~ina follo-.red <br />by bailing on 9/25/87. Pr~ditional developnent by water injection and <br />bailing on 10/19/88. <br />Comments: <br />E-3 <br />