Laserfiche WebLink
• • III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 DIVISION o r <br />Phone: (303) 866-3567 M 1 N E R A L 5 <br />FAX' (303) 832-8106 & <br />GEOLOGY <br />RECLAMATION <br />July 19, 2001 MINING•SAFETY <br />Mr. Todd Stockebrand Bill Owens <br />Governor <br />Asphalt Constructors, II1C. Greg E. Walther <br />7040 W. Hwy. 160 Execwne Director <br />P.O. Box 449 Michael 8. Long <br />AlamOSa, CO 81101 Division Director <br />Re: Del Norte West Valley Pit, File No. M-2001-069, Receipt of 112 Construction Materials <br />Reclamation Permit Application Package <br />Dear Mr. Stockebrand: <br />On July 18, 2001, the Division of Minerals and Geology received additional materials to your 1 l2 ConsWction <br />Materials Reclamation Permit Application package for the Del Norte West Valley Pit, File No. M-2001-069. <br />Preliminary review of the information received detemvned that the following items must be received before the <br />Division can consider your application as being submitted and technical review can begin: <br />APPLICATION FORM: Page 2, Item 9: Needs completing. <br />EXffiBIT S -Permanent Man-Made Structures (Rule 6.4.19): You must provide information <br />sufficient to demonstrate that the stability of any structures located with two hundred (200) feet of the <br />operation or affected land will not be adversely affected. <br />Your application will not be considered submitted until the mfornation listed above is received and found <br />sufficient to begin our review. A decision date will be established 90 days from the date of receipt of all of the <br />requested information. Additionally, if you have already published notice you will need to republish notice, <br />after the Division considers the application submitted. This notice must be pubhshed once a week for four (4) <br />consecutive weeks, starting within ten (10) days of the date your application is considered submitted. We will <br />notify you when you should initiate republication of your notice. The final date for receiving comments is the <br />20th day after the fourth publication or the next regular business day. <br />This letter shall not be construed to mean that there are no other technical deficiencies in your application. The <br />Division will review your application to determine whether it is adequate to meet the requirements of the Ad <br />after submittal of all required items. <br />Sincerely, <br />~.,~,~~~ <br />Suzi Eri en <br />Program Assistant <br />