My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121991
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:10 PM
Creation date
11/25/2007 9:55:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003074
IBM Index Class Name
Permit File
Doc Date
9/12/2003
Doc Name
Incompleteness
From
DMG
To
Rock N Pine LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) indicate the direction that mineral extraction will proceed; <br />(e) note the location of any significant, valuable, and permanent man-made structures within <br />two hundred (200) feet of the affected azea such as houses, barns, fences, above or below ground utilities, <br />irrigation ditches, maintained or public roads, bridges, welts, pipelines, water storage impoundments, <br />railroad tracks, cemeteries, and communication antennas. A narrative description must be provided in <br />Exhibit B -Site Description; and <br />(f) outline and Iabel existing disturbance within and/or adjacent to the permit boundary (e.g., <br />previously mined areas, roads or excavations resulting from utility construction). Re-disturbance of <br />previously disturbed areas, by the proposed mining operation, must be included in the permit area and <br />addressed in Exhibit D -Reclamation Plan. <br />(3) $Prlamafinn Plan Man <br />(a) show the gradiem of all reclaimed slopes (horizontal:vertical) sufficient to describe the <br />post mine topography; <br />(b) indicate where vegetation will noY be established and the general azea(s) for shmb or tree <br />Planting; <br />(c) if ponds aze a part of the Reclamation Plan, outline the final shore configuration of the <br />ponds and shallow areas if the future land use is for wildlife; <br />(d) state the average tliclmess of replaced overburden by reclamation area or phase; and <br />(e) state the average thic]mess of replaced topsoil by reclamation azea or phase. <br />Your application will not be considered Sled until the information listed above is ieceived and found sufficient to <br />begin our review. A decision date will be established 30 days from the date of receipt of all of the requested <br />information. Additionally, if you have akeady published notice you will need to republish notice, after the <br />Division considers the applicarion submitted. Republication must occur once within ten (10) days of the submittal <br />date. We will notify you when you should initiate republication of your notice. The final date for receiving <br />comruems is ten (10) days after the date of publication or the next regular business day. <br />You Lave sixty (60) days from the above date to submit atl necessary documents that the Of&ce needs for an <br />application to be considered filed. If, at the end of the sixty day period, the application Las not been determined to <br />be filed with the Office, the Office stall deny the application and teminate the application file. <br />TLis letter shall not be construed to mean tLat there aze no other technical deficiencies in your application. The <br />Division will review your application to deterrnine whether it is adequate to meet the requiremerrts of the Act after <br />submittal of all required items. <br />Sincerely, <br />Suzi Eric en <br />Program Assistant <br />
The URL can be used to link to this page
Your browser does not support the video tag.