Laserfiche WebLink
• 2.05.3 <br />feet by 80 feet with a 20-foot eave height. The stockpile level building is <br />approximately 30 feet by 170 feet with a 15 foot eave height. <br />Sewaoe Treatment Plant <br />A package sewage treatment plant located near the portal level. The <br />building is approximately 20 foot by 30 foot with a f 0 foot eave height. <br />Water Tank <br />A water tank located on the utility level which is above the portal level. The <br />fabricated steel tank is constructed on an oiled sand base. The tank is <br />approximately 52-feet in diameterand 32-feet high which provides a capacity <br />of approximately 500,000 gallons. <br />Water Treatment Buildino <br />This pre-engineered metal building is located east of the water tank. It is <br />• approximately 14 feet by 20 feet with a 12 foot eave height. <br />Mine Vent Fan <br />A mine ventilation fan and steel duct work located at the return entry on the <br />portal level. The ventilation fan will be approximately 8-feet in diameter. A <br />new fan and fan shaft will be constructed at the utility bench during the last <br />quarter of 1998 and early 1999. The shaft and fan may be up to 18-feet in <br />diameter. See Maps 15-2 and 33. A vent shaft will be developed in <br />Freeman Gulch in 2000. The 400 foot deep exhaust shaft will be lined with <br />a 6-foot diameter steel liner plate. <br />Power Line <br />A high voltage overhead power line extends from the existing Delta Montrose <br />Electric Power line to the portal area substation. The power line is <br />approximately 5,600 feet long. Approximately 750 feet of new power line will <br />be constructed for the downhill conveyor. About 500 feet will be constructed <br />at the portal bench and 250 feet at the highway stockpile area. <br />U <br />PR-O6 2.05 - 12 - 8/01 <br />/~ /PR o bc0 <br />~/I S/oz <br />