Laserfiche WebLink
. , -4 • <br /> <br />RIDER TO MINING PERMIT <br />RIDER TO MINING PERMIT <br />Permit Date: March 12, 1993 <br />Permit No: M-92-074 <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. O1 <br />OPERATOR IS NOT ALLOWED TO MINE IN THE UNDISTURBED ACREAGE OF THE <br />PERMIT AREA UNTIL A CULTURAL RESOURCE SURVEY IS COMPLETED BY A <br />QUALIFIED ARCHAEOLOGIST. OPERATOR IS ALLOWED TO MINE IN THE EXISTING <br />PIBUT, SHOULD ARCHAEOLOGICAL RESOURCES BE DISCOVERED DURING MINING <br />OPERATIONS, EXCAVATION MUST BE HALTED UNTIL THE RESOURCES HAVE BEEN <br />EVALUATED BY THE COLORADO HISTORICAL SOCIETY. AFTER A CULTURAL <br />RESOURCE SURVEY IS COMPLETED THE OPERATOR WILL NOTIFY THE DIVISION OF <br />THE RESULTS. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />ICHAEL B. N <br />Division Director <br />2698G <br />