Laserfiche WebLink
3.5.3 Post Mining Contours <br />The projected postmining topography of Trapper Mine is shown on Map M12, Postmining Topography. <br />This map depicts the expected configuration of the permit area at the end of 2007, except for temporarily <br />abandoned D/E pit that shows postmining topography after it is filled with utility ash near the end of mine <br />life. The postmining topography map was developed using actual topography from aerial surveys in <br />October 2001, along with engineering estimates of material movement from 2003 through 2007. Map M- <br />14A includes a series of cross-sections that provide a comparison of pre and post mining topography in <br />the active mining are for the current permit term (2003-2007). <br />Postmining topography cannot be predicted exactly, however, the best estimate given todays technology <br />is presented. Map M12 is, therefore, an approximation of the recontouring limits with a representation of <br />the shape of the topography that will most likely be produced. However, by March 15th each year of the <br />permit term, Trapper will submit to the Division a map showing actual postmining topography for the <br />previous year. Appendix W will contain each year map. <br />As production fluctuates to reflect changes in economic and natural conditions, the areas requiring <br />regrading may change to a limited extent. Lengthening or shortening of various cuts may occur as they <br />are more precisely designed, and thus cause some deviation from the map as presented. Cut lengths <br />• may be affected as a result of better or worse economic conditions which affect the economic stripping <br />limit, or as a result of differences between inferred coal oxidation limits from existing drill data versus the <br />actual limits encountered when mined. <br />If changes in cut lengths occur, the locations of the pits as of December, 2007, may also be affected as <br />the progression of the pits is a function of their lengths. The pit locations may also be affected by several <br />other factors such as changes in the characteristics of the overburden and interburden which in tum affect <br />digging rates or by changes in scheduled digging times resulting from labor or equipment problems. <br />These influences could cause an increase or decrease in the areas requiring regrading as compared to <br />those shown on Map M12. Regrading areas depicted on Map M12, Postmining Topography, and Map <br />M10 series, represent regrading under maximum production. <br />• <br />3-40 <br />Revision: P~--S <br />Approved: ~ 03 <br />