Laserfiche WebLink
3.2.3 Re lacement <br />To the extent possible, all topsoil salvaged according to Section 3:2.1 is <br />replaced on regraded spoils. Before such topsoil is replaced, the regraded <br />spotls are scarified if needed to relieve ccanpaction. <br />Topsoil is transported to the replacement area and redistributed using scrapers <br />or other similar equipment. 't'he topsoil is distributed in approximately even <br />thicknesses consistent with post-mining Iand use objectives, contours and surface <br />water drainage systems. Fefer [u Section 4.9,3 for further detail of quality <br />control during replaceaent. <br /> <br />• <br />3-2I <br />REVISED FEB 13 '87 <br />