Laserfiche WebLink
iii iiiiiiiiiii iii _ <br />Doc Date:1211112001 <br />5lF <br />• SECTION 6.0 Stock Tank and Dozer Basin Construction Through 1999. <br />6.1 Stock Tanks <br />This section updates the location of all constructed stock tanks through 1999 (see Map(s) 3 Section 3.0). <br />The average tank density for Trapper mined-land areas will not exceed one tank per ten acres. Table 6- <br />1describesthe as-built tank density in association with the specific drainage areas. <br />In 1999, Trapper constructed no new stock tanks. Several new stock may be constructed in 2000. <br />Existing stock tanks meet applicable certification standards. <br />6.2 Dozer Basins <br />As a result of the approval of technical revision TR-73 (1/97), dozer basin locations will be provided in <br />this Appendix W document on an annual basis (see Map(s) 3 Section 3.0). <br />Dozer basins assist sediment impoundments in the containment of sediment, reducing the frequency of <br />Sediment Impoundment cleaning. Dozer basins are typicalty constructed along haulroads, regraded <br />• spoils, and/or on short or long tens disturbed sites. <br />ew+ moo <br />mMCmnErre~ <br />• <br />