My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121781
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:02 PM
Creation date
11/25/2007 9:42:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999004
IBM Index Class Name
Permit File
Doc Date
2/1/1999
Doc Name
SOURCE OF LEGAL RIGHT TO ENTER TABLE MTN QUARRY FN M-99-004
From
MARK A HEIFNER
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ADVANCE MINIMUM ROYALTY -- As minimum attd advance royalty, without relation to the amount of <br />minerals mined from the leased premises, Lessee shall pay annually in advance to Lessor the following amounts: <br />LEASE PERIOD AMR <br />1998 tltru 1999 NONE <br />1999 thru 2008 $20,000 each vear <br />2008 thru 2018 _$40,000 each vear <br />if Lessee does not extract minerals from the Leased Premises sufficient to return to the Lessor the ntinitnum <br />amounts above specified, it is nevertheless understood that the above sums of money are due and payable to <br />Lessor whether or not minerals are mined, but that such advance minimum royalty shall be credited upon the first <br />royalties due as herein provided for minerals actually produced from the Leased Premises. In the absence of <br />production of minerals in continuous paying quantities before the expiration date of the lease, all advance <br />minimum royalties and all rentals shall be forfeited to Lessor. <br />Further, at the end of each five-year period, Lessor may increase the rate or amount of advance minimum <br />royalty to be paid by Lessee by a rate no[ [o exceed the rate of increase of the average Producer's Price Index for <br />sand & gravel construction materials For the previous five year period, as published by the U.S. Department of <br />Labor, Bureau of Labor Statistics. Failure to comply with any new advance minimum royalty rate set by Lessor <br />may subject this lease to cancel{atiott by thirty day written notice by Lessor. <br />In case of assignment of this lease, all advance minimum royalty paid to the state shall be carried forward <br />attd credited to the new assignee. <br />2. PRODUCTION ROYALTY -- Lessor reserves as royalty, and Lessee agrees to pay to Lessor on or before the <br />last day of each calendar month following the month of production, 0.50 per ton of 20001/, or 8% of the gross <br />sale price net transportation, at the first point of sale to an independent purchaser, whichever is greater. <br />Transportation is defined as all haulage beyond the Division of Minerals and Geology Permit boundary [o the <br />first point of sale to an independent purchaser. Transportation charges to a retail sales yard shall not exceed the <br />per ton mile rare for local Transporters. <br />Further, at the end of each five-year period, commencing from the original lease date, for so lung as this lease <br />remains in effect, Lessor may reappraise the property herein leased and increase the minimum per ton rate of <br />production royalty by a rate not to exceed the rate of increase of the average Producer's Price Index for sand & <br />gravel construction materials For the previous five year period, as published by the U.S. Department of Labor, <br />Bureau of Labor Statistics to be paid during each year of the succeeding five-year period. Failure to comply with <br />any new royalty rate set by Lessor may subject this lease to cancellation by thirty-day written notice by Lessor. <br />Reporting of production royalty that is credited against advanced minimum royalty is also due on or before the <br />last day of each calendar month for training during the preceding calendar month. <br />3. EXTENSION -- Lessee may have a preferential right to renew the lease or to receive a new lease after the <br />expiration of the secondary term, whichever may be determined by Lessor to be in the best interest of the State, <br />under the following conditions: <br />A. An advance minimum royalty, the amount to be negotiated before expiration of the lease, will be due and <br />payable annually commencing on the date this lease is renewed or a new lease is executed and shall <br />continue until the expiration of the new or renewed lease. This amount may be adjusted by Lessor at the <br />end of each five-year period of the renewed or new lease. <br />B. Lessee shall furnish [o Lessor satisfactory evidence of plans for mining during the term of the renewed <br />lease or during the term of a new lease. <br />C. Lessee shall furnish adequate geological evidence to Lessor that the acreage subject to the renewed or new <br />lease is in fact an integral part of and contains reserves in a logical mining unit. Whether the acreage is <br />or is not a part of a logical mitring unit will be determined by Lessor. <br />D. An extension of this Lease as determined by Lessor would be in the best interest of Lessor <br />EXTENSION BY PRODUCTION -- This lease may not be held in perpetuity; however, the lease will continue in <br />effect for an additiunal ten years, the secundary term, until _]u] Iy I7_,' 2018 if minerals are produced in paying <br />quantities prior to the end of the primary term. Cessation of production for a period in excess of 180 consecutive <br />days will automatically remove lease from producing status unless otherwise agreed to in writing by Lessor. <br />Lessee shall notify Lessor of each cessation of production, the reasons therefor, and the time period during which <br />production will or did cease. <br />Payine quantities means productiot suFficient to return royalties to Lessor equal to the advance minimum <br />royalty. <br />5. ANCILLARY USE -- Lessee may remove approved minerals, and place on the Leased Premises stock piles of <br />material mined From this lease and such equipment as is approved by Lessor for this removal. All other ancillary <br />Page 2 of 7 <br />~` <br />
The URL can be used to link to this page
Your browser does not support the video tag.