My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121771
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:02 PM
Creation date
11/25/2007 9:42:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985085
IBM Index Class Name
Permit File
Doc Date
9/13/1985
Doc Name
M-85-085 RANCHO ROSADO PIT 2 GARY BOYCE
From
SUMMIT ENGINEERING CO
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~CLAMATION COST BREAKDOWN. <br />I FINAL GRADING - maximtun of five (5) acres in any one year. <br />The equipment required will be a crawler dozer and maintainer. <br />The proceedure should take no more than three (3) days. The cost <br />incurred would be: <br />24 hours dozer at $100.00/hour $ 2,400.00 <br />24 hours maintainer at $100.00/hour $ 2,400.00 <br />Total cost/5 acres 4,800.00 <br />or $960.00/acre <br />II TOPSOILING - maximum of five (5) acres in any one <br />year. The equipment required will be an elevated <br />scraper, maintainer, and sheeps foot compactor. The <br />proceedure should take no more than two (2) days. The <br />cost incurred would be: <br />16 hrs elevated scraper at $100.00/hour $1,600.00 <br />16 hrs maintainer at $100.00/hour $1,600.00 <br />8 hrs sheeps foot compactor at $ 50.00/hour $ 400.00 <br />Total cost/5 acres 3, .0 <br />or $720.00/acre <br />III SEEDING, MULCHING AND FERTILIZING - Maximum of five <br />(5) acres in any one year will be seeded. The <br />proceedure will take one laborer two (2) days and a farm <br />tractor one day for mulching. The cost incurred would <br />be: <br />5 tons cattle manure at <br />8 hours farm tractor at <br />16 hours labor at <br />100 lbs PLS at <br />100 bales straw at <br />Total cost/5 <br />or <br />$100.00/ton $ 500.00 <br />$ 50.00/hour 400.00 <br />$ 10.00/hour 160.00 <br />$ 20.00/lb 2,000.00 <br />$ 1.00/bale 100.00 <br />ac res 3,160.00 <br />$ 632.00/acre <br />IV WATERING AND FENCING - It is estimated that watering <br />and fencing will cost $50.00/acre/year. <br />TOTAL RECLAMATION COST/YEAR <br />~~~E11P ~Lk~/ <br />I $ 960.00 <br />SEP 1 3'1985 <br />II $ 720.00 <br />MINEU LAND <br />III $ 632.00 RECLAMATION DIVISION <br />IV $ 50.00 <br />2,362.0 /ACRE/YEAR <br />OR <br />$47,240.00 for the entire life of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.