Laserfiche WebLink
• HYDROLOGY <br /> LIST OF FJCHIBITS <br /> (Continued) <br /> 7-12 Pond #004 <br /> 7-1ZA Pond 004 Principal Spillway Replacement As-Built <br /> 7-13 Proposed Pond #004 Details <br /> 7-14 Typical Road and Ditches Details <br /> 7-15 Surface and Groundwater Rights Plat <br /> 7-16 Sediment Pond #007 <br /> 7-16A Truck Wash Facilities Layout <br /> 7-166 Truck Wash Facilities As-Built <br /> 7-17 Sediment Pond 008 <br /> 7-17A Sediment Pond 008 (1966 As-Built) <br /> 7-178 Sediment Pond 008 Proposed <br /> 7-17C Sediment Pond 008 (1992 As-Built) <br /> 7-17D Pond 008 Principal Spillway Redesign <br /> 7-17E Pond 008 Principal Spillway Replacement As-Built <br /> 7-18 Proposed Permanentlmpoundment Pecoco <br /> 7-18A PECOCO Impoundment A5-Built <br /> 7-19 Postmining Drainage Control <br /> 7-20 Postmining Channel Profiles <br />• 7-21 Pond 004 Pdncipal Spillway Redesign <br /> 7-22 Pond 004 &008 Watershed Boundary <br /> 7-23 Channel SIIPM-1 Profile and Sections <br />• <br /> TR-37 zi <br />Revised 01/06 <br />