Laserfiche WebLink
<br />"EXHIBIT H" <br />Estimated cost of reclamation: <br />The following schedule of reclamation cost is submitted on the <br />basis that a substantial portion of the reclamation is actually <br />an integral function and cost of mining operation: <br />Shaping and stabilization of <br />highwall surface. <br />i Parcel 2, 3 and 4. <br />A function and cost of mining. <br />Shaping and grading of highwall <br />terraces. <br />Parcel 3 and 4. <br />A function and cost of mining. <br />Revegetation of highwall <br />terraces. <br />Parcel 3 and 4 <br />Placing of top soil <br />Seeding and mulching <br />Shaping and grading of quarry <br />floor. <br />Parcels 2, 3 and 4 <br />A function and cost of mining. <br />Reconstruction of Jackson Gulch <br />Shaping 1~ acres <br />A function and cost of mining. <br />Check dams <br />3,300 cu. yds. @ $ 1.00 <br />4 acres @ $700.00 <br />Shaping and grading benches and <br />backslopes. <br />Parcel-1 62,000 cu. yds. @ $ 0.75 <br />Revegetation of backslopes. <br />Parcel-1 <br />Placing of top soil <br />Seeding and mulching <br />Shaping and grading of roads <br />Parcel 1, 2, 3, and 4 <br />A function and cost of mining. <br />4,000 cu. yds. @ $ 1.00 <br />5 acres @ $700.00 <br />$ 3,300.00 <br />2,800.00 <br />8,000.00 <br />46,500.00 <br />4,000.00 <br />3,500.00 <br />~. <br />