Laserfiche WebLink
1 <br />i <br />1 <br />1 <br />1 <br />The estimated <br />Stage <br />Stage <br />Stage <br />Mining will o <br />for the mined <br />i <br />timetable <br />1 - <br />2 - <br />3 - <br />cur on an <br />material. <br />EXFIIBIT B (Cont'd) <br />of mining is: <br />1978-1979 <br />1979-1980 <br />1980-1981 <br />intermittent basis, depending on demand <br />-5- <br />