Laserfiche WebLink
<br />m <br />Table C17. Water level measurements obtained from well Qal-6, <br />C~ <br /> Water Level Measured <br />Date _ Time MP GS MSL By Remarks <br />10/22/79 13:11 2.05 0.35 C.J. MP ~ 1.70' Just drilled 6 flushed w/water. <br />10/24/79 15:45 7.17 6.37 E.B. MP Changed = 0.80 "~ <br />10/30/79 15:14 7.11 6.31 <br />4121/80 13:37 6.12 5.37 J,H. 6 D.G,C, MP t 0.75' <br />7/10/80 14.33 6.51 5.63 5314.37 J,H. MP 1 0,88 <br />10/9/80 - - - - <br />11/25/80 - 6.92 - - D.G.C <br />12/23/80 8:35 6.80 6.10 - D.G.C. MP t 0.7 <br />1/27/81 9:55 6.96 6.26 - D.C.H. t ~~ <br />2/23/81 12:10 6.26 5.56 - D.C.H t ~~ ~ <br /> . <br />