Laserfiche WebLink
i <br />00 <br />Y Table Cll, Water level measurements obtained from well Qal-4, <br /> W ater Level Measured <br />Date Time MP GS MSL By Remarks <br />10/11/79 11:30 12.33 9.51 5311.5 V.H. & E.B, MP 'f 2.82' Well just completed. <br />10/12/79 11:05 12.07 9.25 5311.8 E.B. MP T 2.82' Top of 4~" PVC <br />10/17/79 09:25 9.25 6.43 5314.6 C.J. & D.C,C, <br />10/19/79 15:10 9.74 6.92 D.G.C. <br />10/22/79 12:54 9.70 6.88 C.J. <br />10/30/79 14:40 7.51 6.71 E.B. MP changed = 0.80'} <br />4/21/80 12:50 6.60 5.80 5314,7 J,H. b D,G.C. " <br />7/10/80 13:48 6.18 4,31 5316.19 J,H. MP ? 1.87 <br />10-9-80 - - - - <br />11-25-80 - 7.27 5.40 5315.10 D.G.C. <br />12-23-80 7:55 7.12 6.27 5314.23 D.G.C. MP 0.85 <br />1-27-81 8:30 7.23 6.40 5314.10 D.C.H. MP 0.83 <br />2-23-81 12:51 6.86 6.03 5314.47 D.C.H. <br />n <br />m <br />