Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No. Task Description ~ Lost (E) <br />__________________________________________________________I__________ <br />NA ~ Portal secured by existing steel grate closure <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description Cost (E) <br />________I__________________________________________________I__________ <br />NA ~ Not indicated in reclamation plan <br />Subtotal (U: <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. <br />________ ~ <br />I___________ Task Description ~ <br />_______________________________________I_ Cost (E) <br />__________ <br />3 ~ DemoLi lion assume mass 8'H * 5'W * 10'L a E.22/cf~ S55 <br />2 ~ Seeding per attached task 2 worksheet ~ 5636 <br />NA ~ Fencing not required at [his time <br />4 ~ Mob/Demob per attached task 4 worksheet ~ E522 <br />Subtotal (H): E1,213 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through N): E1,616 <br />fI. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ [Cem Description ~ Cost (E) <br />________I______.,___________________________________________I____________ <br />1. ~ Public Liability insurance.... 1.SSOX of dir. ~ E25 <br />2. ~ Contractor's Performance Bond 1.SSOX of dir. ~ E25 <br />3. ~ contractor's Profit........... 10.00% of dir. ~ E162 <br />4. ~ Job Superintendent.. equip op serves as super <br />Subtotal (A ): E212 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E1,828 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />1. ~ Minerals Program Adm 5.00% of cntr.~ E91 <br />NET INDIRECT COST PERCENTAGE: 18.76Y. Subtotal (B): E91 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E303 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E1, 919 <br />