C: <br />~~ <br />(e) A plan or schedule indicating how and when reclmnation will be implemented. Include.• <br />(i) an estima[e of the periods of time which x~il! be required for the various slages or phases of <br />reclmnation; <br />Mining Schedule <br />Section Being Mioed Timing Estimate <br />Pod #1 27 months to mine <br /> 12 months [o reclaim <br />Pod #2 44 months to mine <br /> 9 months to reclaim <br />Pod #3 76 months to mine <br /> 9 months to reclaim <br />Pod #4 15 months to mine <br /> 9 months to reclaim <br />Pod #5 & Processing Site l9 months to mine <br /> 12 months to reclaim <br />Please note that the above schedule is an estimate based on the current market conditions. <br />However, the timing may vary depending upon the demand for construction material and may <br />impact the total life of the mining operation. <br />(ii) a description ojrhe size ar:d location of each area to be reclaimed during each phase; and <br />Please refer to the Reclamation Plan Map (Exhibit F). <br />(iii) outlining the seq:~ence in which each stage or phase of reclamation will be carried ait. <br />Please refer to the Reclamation Plan Map for the reclamation sequence. <br />(~ A description of.' <br />(i) final grading - marimi~m anticipated slope gradient or expected ranges thereof,• <br />All disturbed areas shall be regraded and smoothed to a finished grade suitable for <br />revegetation. 3:1 slope below high water line; 4: l slope on reservoir banks. <br />AGGREGATE INDUSTRIES, INC. -- MILLIKEN RESOURCE 112 PERMIT PAGE 18 <br />