Laserfiche WebLink
<br />Reclamation Costs (Exhibit L <br />1. Reclamation cost estimates are bases on the assumption that only 18" of <br />overburden and 3" of topsoil will be reaistributed. These estimates <br />should be based on the maximum amount of material which may be <br />stockpiled on site in the event of a bond forfeiture, not the <br />operator's final reclamation scenario. Please revise as appropriate. <br />/ 2. Th~Sestimate does not include any Drovision for mobilization/ <br />,/ demobilization of equipment, removal of plant facilities and buildings <br />and other indirect costs. Please revise the estimate to include these <br />items. I would recommend that you increase your estimate by the actua~ <br />anticipated costs of removing plant facilities and building Dlus a .15% <br />allowance for indirect costs. --~ <br />8745x'/scg <br />- 3- <br />