Laserfiche WebLink
BN 111 LOADOUT <br /> <br /> <br /> <br />2.05.5 POST-MINING LAND USE <br />The railway company desires that the land be left in industrial <br />use as a coal loading site and storage area. <br />The sump and berms will remain as sediment control measures. <br />All coal handling equipment will be removed from the site and <br />all excess fill from the truck ramps and haulage roads will be <br />transported from the site during reclamation. <br />661 <br /> <br />