Laserfiche WebLink
BN NI LOADOUT <br />• <br />2.05.3 (4~ PONDS, IMPOUNDMENT, AND DIVERSIONS <br />The loadout area includes approximately 3 acres of developed cropland. Runoff from the site <br />will be controlled by collection berms which will divert all runoff to a sediment fence located <br />at the northeast corner of the site as shown on the Burlington No. 1 Loadout Map (Exhibit L). <br />Run-on to the site is effectively controlled by the farm light-use road located along the <br />northwest edge of [he loadout. All drainage structures will be constructed to safely pass the <br />peak discharge from a 10-year, 24hour event. All designs can be found in the Small Area <br />Exemption for the loadout located in Addendum D. <br />• <br /> <br />n:vssaTao~.res <br />,vZUS, ,:,m 654R Revised -November 1993 <br />