Laserfiche WebLink
SAiQTA FE LOADOUTS <br />203.8 Permit Term Information <br />The area to be permitted consists of two small tracts in the <br />Trinidad railroad yards, one of ~.0~ acres and the other 1..'0 <br />acres. <br />Phases of the Fermit <br />Phase 1 - Construction ---- to begin immediately after <br />permit issuance. <br />Phase ~ - Operation ------- to begin appro>;imately one month <br />after the start of construction. <br />Current scheduling for loadout operation is in September of 198. <br />From the start of construction until the end of the permit term, <br />• the affected area will be the entire lease area of '..'^< acres. <br /> <br />600 <br />