Laserfiche WebLink
SANTA FE LOADOUTS <br />2.05.3 Operation Plan: Permit Area <br />2.05.3 (1) Production Methods and Equipment <br />Lease # 1 See Map No.23. <br />Highway trucF;s will enter- the loadout on e:;isting haul roads and <br />will dump into a ~5 ton hopper which will feed two ~+b inch <br />conveyor stacF:ers to load the railroad cars directly. The two <br />starkers are used to load on either trac4: bordering the lease <br />area. The er;pected yearly tonnage 'to be loaded at this site is <br />'00.0~~0 tans. Nostock:piling will occur at this lease site. <br />Lease # ~ See Map No. 23. <br />• Highway tr•ucF;s will enter the loadout on e>;isting haul roads and <br />wilt dump on the ground. A front end loader will stack.pile the <br />coal rand load cars directly. The er,pected yearly tonnage to be <br />loaded .at this site is 50,000 tons. <br />The maximum tonnage to be stocG~piled is 6000 tans. <br />J <br />611 <br />