My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121438
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:49 PM
Creation date
11/25/2007 9:22:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Permit File
Doc Date
4/12/1979
Doc Name
SNYDER QUARRY EL PASO COUNTY FN 77-210
From
MLR
To
EVANS & BRIGGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiumiii <br />Apr11(2, 1979 <br />Mr. Paul Y. Evens, Esq. <br />Evans and Briggs <br />Min4ng Exchange Building <br />Suite 222 <br />8 South Meveda <br />Colorado Springs, Colorado 80903 <br />RE: Snyder Quarry, E) Paso County <br />Our File 977-210 <br />Dear Mr. Evans: <br />Subsequent to our review of the Snyder Quarry application we hive <br />determined there are a number of Items that appear to be Inadequate. <br />These Items are as follows: <br />A. Mining Plan <br />1. 11hat quantity of topsoil will be salvaged from the yet <br />unaffected areas of the mine? <br />2. Mhat quantity of topsoil has bean salvaged from the <br />areas that have been affected and where has It been <br />stockpiled? <br />3. Identify all the areas that have been affected since <br />July 1. 1978 as this Is the area of already affected <br />land that will actually be included in the permit. <br />4. A mining timetabie that clearly Ind) rotes: <br />(a) estimated Ilfe of the mine; <br />(b) the propassd segwnts of affecting new areas; <br />(e) the approximate deviation and area of each <br />phase of mining; <br />(d) the aiaxlewm known extant 4f the mining operation, <br />and <br />(e) the progressive development of the bens. <br />5. Nith respeet to the construction of the berm: <br />(a) Mhat !s the anticipated date wMn the <br />here w111 De oo:spleted7 <br />(b) Mhat is flu physleal composition of the <br />material being used to build the berms <br />(c) Now Is the berm Dsinq construetadl More <br />spscifically, Iww Is the ieatsrlal deposited <br />and compacted? Mhat assurance cart be given <br />that under heavy water rotantlon the bens <br />will not fall uusing a landsll~iaor eudflow? <br />
The URL can be used to link to this page
Your browser does not support the video tag.