Laserfiche WebLink
<br />• `.~. "Specify the reclamation treatment of any waste rock, <br />dumps, tailing impoundments, underground mine openings, <br />ditches, sediment control facilities, buildings and other <br />features not addressed." <br />There will be no waste rock dumps since all rock will be <br />sold as product. Neither will there be any dumps, <br />tailings impoundments, underground mine openings ditches, <br />sediment control facilities, buildings or any other fea- <br />tures not previously addressed in this narrative involved <br />in any way with this operation. <br />6. "Financial warranty for Limited Impact operation that <br />does not utilize cyanide processing." <br />Projected reclamation costs: <br />Backsloping - will be performed in mining process -0- <br />Topsoiling - average 9" - 12" = 1210 cy/A @ $0.50 cy= <br />..............................................$605/A <br />Discing or chiseling .............................$ 20/A <br />Fertilizer - 40#/A available N&P (applied)...... $ 27/A <br />• Mulch - 4000#/A straw or grass hay @ $45/T...... $ 90/A <br />Mulching ....................................... $ 20/A <br />Grass seed mix 4.23#/A PLS @ $3.50/#............ $ 15/A <br />Drilling ...................................... $ 20/A <br />Total .............. $797.00/A <br />9.98 A x $797/A ...............$7954.06 <br />x 15.6% indirect cost ......... $1256.74 <br />$9210.80 <br />These costs are based on maximum disturbance of the total <br />9.98 A and applicable costs for the area. With <br />backsloping during mining and topsoil replacement on fin- <br />ished areas, there will never be a total of 9.98 A <br />maximum disturbance. The applicant, therefore, requests <br />a 25% reduction in the total estimated costs to $6,908.10 <br />rounded to: <br />• $7,000.00 <br />