My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121385
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:47 PM
Creation date
11/25/2007 9:18:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
NPDES Permits for the Mine and Loadout Facility
Section_Exhibit Name
4.0 Appendix 4-G
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. SPECIAL REQUIREMENTS <br />PART I <br />Permit No. 00.0029599 <br />Page No. 12 ~ <br />i <br />2. Stormwater Requirements (continued) <br />a) Documentation of Permission: The plan shall include documentation of permission from tfie land owner, if <br />the remediation work is undertaken by someone other than the land owner. <br />b) Photographs: The plan shall include photographs documenting the condition of the inacrive~mine site before <br />any remedial action has occurred. For recently active mines, photographs of the active mining phase may <br />be substituted. ~ <br />c) Description of Remedial Action: The plan shall describe the remedial action that will take place to <br />minimize or eliminate the water quality impacts from the mine waste. The description shall) include: <br />- Remediation Goal Statement; <br />- the characteristics of the mineralogic content of the mine-waste, and estimated volume of+the waste; <br />- description of any materials that will be mixed into the mine waste on site; and j <br />- estimated surface area of the final site, and estimated angle of side slopes. ~ <br />d) Description of BMPs during Remediadon Activities: The plan shall describe BMPs that will be implemented <br />to reduce the potential of remediation activities to contribute pollutants to stormwater discharges. Activities <br />that shall be addressed include vehicle maintenance, earth moving, material storage and spill prevention. <br />e) Procedures for Disposal of Water Stored Within Mine Waste: The permittee must describe how any water <br />stored within the mine waste will be collected and/or routed to any storage or treatment facilities. No <br />discharge of this water shall be made to waters of the state, unless autherized under the process <br />portion of this or another permit. <br />I <br />f) Description of Permanent BMPs, Final Site Stabilization, and Ultimate Land Use: The plan shall include a <br />description of the specific permanent measures that will be installed or used at the minewaste site. The <br />description shall include any of the following if appropriate: specifications for capping or isolation of the <br />mine waste, method and type of revegetation, and other permanent BMPs. The plan shall also include a <br />description of the ultimate land use after remediation is complete. <br />6) Consistence with Other Platts <br />SWMPs may reflect requirements for Spill Prevenrion Control and Countermeasure (SPCC) plans under section <br />311 of the CWA, or Best Management Practices (BMPs) Programs otherwise required by a CDPS permit, aad <br />may incorpora[e any part of such plans into the SWMP by reference. The SWMP may reflect information <br />contained in approved plans submitted for other similar pollution control programs, including the Voluntary <br />Clean Up Program. (Voluntary Cleanup and Redevelopment Act, CRS 25-16-303) as long as they contain the <br />elements described above. These plans must have been approved by the implementing) agency prior to <br />application for the Stotmwater Permit. Appropriate portions of these other plans may be iticorporated in the <br />SWMP by reference, as long as a complete SWMP can be reproduced and submitted to the requesting agency <br />within the time frame specified in the request. Those portions of the referenced documents must be included in <br />the submittal. The SWMP must also be readily available to an on-site inspector. <br />b, General Limitations <br />The following limitations shall apply to all discharges authorized by this permit: ' <br />1) Stormwater discharges from mining operations or mine-waste remediation projects shall not cause or threaten to <br />cause pollution, contamination or degradation of State waters. j <br />
The URL can be used to link to this page
Your browser does not support the video tag.