Laserfiche WebLink
<br /> <br />EVERHART GRAVEL PIT <br />EXHIBIT D <br />Mining Plan continued): <br /> <br />Our mining operations will be limited to less than 10 acres at a time to reduce mining impact on <br />the area and because our operations have historically been small. Reclamation of the site will <br />be on going. We will perform reclamation on an average of every 6 acres as we go. Our <br />experience with the Pope's No. 1 Pit has been that vegetation is relatively easy to establish in <br />this area and we don't believe this site will be any different. Additionally we will be keeping a <br />buffer of 150 to 200 feet of undisturbed vegetation between the mine area and the Red <br />Creek. This is similar to what has been done in the Popes No. 1 Pit and it appears to <br />work adequately to catch any silt or sediment that would otherwise enter the Red Creek. <br />Revisions are noted in bold. <br />Page 2 of 2 <br />10/21 /97 <br />