Laserfiche WebLink
~.otoraao liepartment oT Yubhc Health and Environment <br />Air Pollution Control Division <br />- MINING OPERATIONS - <br />D. OVERBURDEN STOCKPILE(S) <br />• Maximum Stored At One Time None Tons <br />Proposed Controls For Overburden Stockpile: <br />^ Watering Times/Day <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />Page 3 of6 <br />^ Enclosures (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Yeaz Of Soil Disturbance <br />® Other (specify) No Over Burden <br />E. DRILLING <br />Number Of Holes Drilled Per Day: 10 days per yeaz <br />Nttmber Of Holes Drilled Per Yeaz: 1500 <br />Proposed Controls For Drilling: <br />® Water Injection <br />^ Chemical Stabilizer <br />®Bag Collectors <br />^ Other (specify) <br />F. BLASTING <br />Number Of Blasts Per Day: N/A <br />Number Of Blasts Per Yeaz: 5 <br />Type of Blasting Material Used: TBD <br />Tons of Blasting Material Used: TBD <br />Hours Of Emissions Per Day: <br />G. RAW MATERIAL REMOVAL <br />Maximum Tons Removed Per Day: 2000 <br />Tons Removed Per Yeaz: 500,000 <br />Drop Height: 5 Feet <br />Specify Moisture Content: N/A %, (if knovm) <br />Proposed Controls For Raw Material Removal: <br />® Moist Material <br />® Water Spray <br />^ Other (specify) <br />H. RAW MATERIAL STOCKPILE(S) <br />Maximum Stored At One Time: 10,000 Tons <br />- ,# •< <br />Proposed Controls For Raw Material Stockp~ <br />® Watering Times/Day <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />^ Enclosures Type: (Complete or Partial) <br />• ^ Revegetation Revegetation Must Occur Within One Yeaz Of Soil Disturbance <br />^ Other (specify) <br />Revised September 2004 httn'//wunv cdphe state co us/ap/stationary htnil <br />