Laserfiche WebLink
I• <br />Q. Compliance with the requirements of the Colorado Department of Transportation prior to <br />operation. <br />R. Notification .to the Department along with an updated site plan drawing and revised, <br />updated or new Division of Minerals and Geology Reclamation Permit prior to operation in <br />anew phase of mining. <br />S. When available, the approximate Iodation of the multiple areas to be mined shall be shown <br />on the site plan drawing. <br />T. Lazson Colorado, LLC will replace the existing cattle guard on County Road 69 with a new <br />cattle guard which matches the road width and will withstand H-201oading. <br />Mr. Commissioner Lasha seconded the adoption of the foregoing Resolution and upon a <br />vote of the Commissioners as follows: <br />Mr. Commissioner Lasha: ~ /Nay /Absent <br />• Mr. Commi§sioner Norden: ~ /Nay /Absent <br />Mr. Commissioner Stiehl: ~ /Nay /Absent <br />The Resolution was declared to be duly adopted. <br />DATE: May 23, 2006 <br />OF COUNTY COMMISSIONERS <br />• <br />CUP 06-OOI Dyzan[ine Quarries Resolution No. 36 -Page 5 of 5 <br />