My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121221
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:40 PM
Creation date
11/25/2007 9:11:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977094
IBM Index Class Name
Permit File
Doc Date
1/25/1979
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1~~. ~7, l ~~ q ~ <br />Minino Plan <br />The material to be mined is of various quality sand and gravel. For <br />this reason, the progression of the mine is based on the demand for <br />a particular commodity at a given time. <br />Prior to extraction of the material to 6e sold, all topsoil and subsoil <br />suitable as a growth medium will be stripped by a scrapper and stockpiled <br />on site. The topsoil and subsoil is to be segregated and stockpiled <br />separately. The depth of topsoil ranges from 0"-18". The depth of sub- <br />soil or overburden ranges from 18" to 10 feet. The depth of the gravel <br />is from 9-20 feet. Currently materiai is stockpiled on the site which <br />includes a stockpile containing approximately 25,000 cubic yards of top- <br />soil. <br />The amount of area affected by mining has averaged 1 to 2 acres per year. <br />Equipment to be used in the mining operation includes a scrapper, loader, <br />D-8 cut, and, as needed, a portable crushing and screening plant. <br />II. Reclamation <br />The timetable for the area to be mined is such that a given area will be <br />mined for its particular value when there is a market demand. However, <br />once extraction of material has been completed, the area will be regraded, <br />retopsoiled, and reseeded within one growing season of the completion of <br />mining. <br />Post mining contours will not exceed 3:1 slopes. The area will be retop- <br />soiled with 6" - 12" of salvaged topsoil. The operator intends to use <br />manure as an amendment to the soil. The manure will be disced into the <br />soil. At the time of reclamation if it is determined that soil amendments <br />such as phosphorous or nitrogen need to be added, they will be added. Also, <br />after the seed has been drilled, straw mulch will be used if it is deemed <br />necessary. <br />The area is to be grazed after reclamation, however, grazing will not be <br />allowed until the Mined Land Reclamation Board and the Soil Conservation Scrvict <br />have been consulted and approve a grazing program. This means reclaimed <br />areas will need to be fenced to prevent grazing. <br />The seed mix is: Western Wheatgrass 3 ib. P.L.S./Acre <br />Side Oats Gramma 5 lb. P.L.S./Acre <br />Blue Gramma ,5 lb. P.L.S./Acre <br />Sand Dropseed ,5 lb. P.L.S./Acre <br />+ } lb./acre yellow sweet clover <br />'i/~o-~~~'` 'tJ~1 Sig/~~reti'~~/---~ - <br />O ,p <br />
The URL can be used to link to this page
Your browser does not support the video tag.