Laserfiche WebLink
8 <br />The \\'hite Rocks mining <br />and reclamation project ~+•ill <br />be conducted in stages Deer a <br /> <br />period of nine years. <br />Beginning at the perimeter, <br />each annual cycle provides <br />Cor mining from October to <br />R'Iarch; reclamation in March <br /> <br />and April (including tree and <br />grass planting); and hauling <br />from stockpiles from D1ay <br />to October. Air and water <br />yualih~ are monitored <br />frequently. \Vhen the mining <br />and reclamation project is <br />completed, the entire site will <br />return to a scene similar to <br />that which greeted the first <br />man that strolled the banks of <br />Boulder Creek. <br />