Laserfiche WebLink
r <br />~ C~ <br />~: <br />k_ ' . <br />r- :., , ' <br />~ :.Y~ V ;~~. . <br />N~ <br />t <br />`:,, , . <br />(k' <br />. - '.:i ' <br />:.1.. <br />• <br />.~ ~r' <br />EXHIBIT $ <br />MINING P N <br />BI.UT<< JET MiN~, INC. <br />i <br />.~ . <br />.. The area which comprises the Blue Jet claims was first entered by appli- <br />cant far discovery and ugcovering material in aid of discovery in 1968. The area <br />vas left idle until,~pm~.matf!ly 197~`at which time more exploratory work a~pd <br />larger sampling of the ,area was performed. An area was cleared for the explora- <br />tort' and samplisglvoek by ,use of a bulldozer and bACkhoe. .Very little top soil was <br />encountered over muph of the area but the top soil that was encountered was stored <br />scutth of tAe exploration pit. There was es}oountsred however, Sedimentation and <br />muck ~cvL~ieh was stock piled ~6uyh 4f'the exploration pit in the same area as the <br />i. <br />Small ge~tity of topsoil. ~; <br />- ~ -,; ~..a:.~ •., a ..l .,, <br />As tilt exploration hole was enlarged topsoil was removed and stock <br />.~' ; <br />~' pijgd w' "tom egnd't . ah: skow ° oFtle•e~iora~ <br />~' `,'' ti0n pfit." ~s ~york a aiu oite with li~izerb~attd baekhoes. <br />g ~'~. - <br />~ .~ <br />~'.- -The area for which 1~h@'lin?~ie~[i i1~aCt' permit is desired has been core <br />t ~~ ; ; <br />drilled and'the desired ors bodies r~~hrodgho~t the aroa. It' is YnEended to con- <br />. { -:,:, r <br />~'. ~ tiiwe etiping from the e~larafion pirti~,~3sasthesHy and southeasterly direction as <br />~, <br />q.. <br />K,:. Well aB s~peniag a pl$C.sr;operation m that area as well as a placer operation north :a <br />r.. <br />~~ . of the iniiI site as ehowu on the ntap. All topsoil encountered will be removed and <br />k, stock piled ~witiun the permit Qrd9 as shown on the geeeral matt.. From the explore. <br />. tion and sou9pliag"in thq area it would appear.thAt the topsoil varies in depth from <br />;~ <br />fro to•kw®iye inches arith the average dapth~bGing five inch$S. After the topsoil <br />~::. <br />is removed and stock piled tk~ osa material will be loaded oat and stored at the . <br />~' mill site fer precesaigg, The ml.ll site can be located on the gegexal map and is <br />within the'p~rmit Brea. 1t is ®ntibipatle$ that the removal 0f topsoil and re+`overy <br />L ,' <br />- of.the ore materiai will be done with a'bulidozer, laaekhoe and possibly a front- <br />,~ <br />~. end loader: <br />It is anticipated that the maapmum depth of milling will be seventy-five <br />feet. During the misting process arty rock or solid wails will be maFintained at a <br /> <br />