My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121132
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:36 PM
Creation date
11/25/2007 9:05:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977326
IBM Index Class Name
Permit File
Doc Date
9/30/1977
Doc Name
LIMITED IMPACT & SPECIAL 10-DAY PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'. <br />1 _. <br />-2- <br />TYPE OR PRINT CLEARLY <br />14. Present land use <br />Grazing, Mining Operations Clay P~ <br />(i.e., agricultural, industrial, etc.) <br />15. Proposed future land use Dry Range Land ~ <br />(Goal of reclamation) <br />INSTRUCTIOt?S: This application form must be submitted in duplicate and each form must <br />be accompanied by the following information and items. The application <br />will rot be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />EXHIBIT A - Legal Description <br />The legal description must identify the affected land and be wholly adequate for <br />field location of the property. It can be in the forn of metes and bounds survey <br />or a description by reference to to.vnship, range, and section to a[ least the <br />nearest quarter quarter section. Idhere applicable, the street address or lot <br />number(s) may be used. <br />EXHIBIT B - ?3i,ning Plan <br /> <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. <br />EXHIBIT C - .`tap <br />This map should be as comprehensive as possible in terms of clearly defining <br />the permit boundaries and indicating all roads or sto:?;pile areas to be used in <br />connection with the operation. All immediately adjacent lando•.mers must be shown. <br />The closest quarter section corner, section line, or any other locateable point <br />should also be shown on the map. <br />EXHIBIT D - ?dildllfe. [dater Resources, Veleta*_ion and Sails Irformat <br />Each of the above-mentioned subjects must be addressed as outlined in the <br />applicable Rule, under item number ten (10). <br />EX'rIIBIT E - Reclamation Plan <br />As with the mining glen, t?:is should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />land affected by each. If possible, the plan should be closely correlated <br />with the map. If not, the narrative must be comprehensive enough to draw an <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />EXHIBIT r - Pxoof of Local Government Approval . <br />This must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />EtOiIBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax <br />receipt. In lieu thereof, a statement acknowledged by a notary pub'_ic that <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECIAL 10-DAY PERt~SITS OILY°* <br />EXHIBIT H - Reclamation Costs <br />If the surety is requested [o be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. <br />EXHIBIT I - Terms of Governmental <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it was required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.