Laserfiche WebLink
<br />• <br />CATERPILLAR INC. <br />FLEET PRODUCTION AND COST ANALYSIS <br />CDMG - II-W RN #02 SCC 19-APR-1 <br />-------------------------------------------------------------------------------- <br />rx++x rrxrrxxxxx xxx++++xxr <br />xrxxxrx++rrxrxx rxxxrxrxxxrx <br />xr+x xxxx rxxx <br />rxrr xxxx xrxx <br />rrxxxxrrrrx xxxr rxxx <br />•+xrrxxx+xxx xxxrxxxxxrxr+xrx <br />xwrr xxxxxxrrxxxxxxrx <br />wx+x rxxx <br />xxxr xrxx <br />rxxrxxxx <br />rrrxxxrrxx <br />xrx <br />... <br />xxr <br />rrx <br />rrr <br />•xxrrxxxrrxx <br />xrxxxrrxxxrx <br />COPYRIGHT 1993 - CATERPILLAR INC. <br />u <br />Due to the many variables involved <br />consequent possibility of inadvertant <br />reports of this character, neither Cate <br />does represent or warrant, expressly or <br />this report or that the Caterpillar or <br />in the report will in fact achieve the <br />to which this report relates. <br />25-2-78 <br />in earthmoving projects and the <br />errors or omissions in preparing <br />:pillar Inc. nor the dealer can or <br />implicitly, either the accuracy of <br />competitive equipment referred to <br />performance indicated on the job <br />Revised 04/01 <br />