Laserfiche WebLink
<br />• <br /> <br />CATERPILLAR INC. <br />FLEET PRODUCTION AND COST ANALYSIS <br />CDMG - II-W RN #02 SCC 19-APR-1 Page -10- <br /> Cost Summary --L TS REPL - E@92+00 <br /> CDMG - II-W RN #02 21,124 TONS <br />-------------- <br />I ------------- - ------------- - <br />(Cost per Hourl ---------- - <br />Operating I ------------ --- <br />I ------ <br />$ per <br />I Equipment Qty Model (each unit) I Hours I $ Total TON <br />-------------- <br />I Loaders ------------- - ------------- - <br />I ---------- - <br />O I ------------ --- <br />O ------ <br />0.000 <br />-------------- <br />I Haulers ------------- <br />4-637E - ------------- - <br />I 225.62 I ---------- - <br />69 ------------ --- <br />15,619 ------ <br />0.739 I <br />I I I O I O 0.000 I <br />I <br />Total <br />9 I I ------- I <br />69 I ----------- I-- <br />15,619 I ----- I <br />0.739 I <br />------------- <br />I Support # 1 -------------- <br />1-14G - <br />I -'---- <br />99.56 I - ---------- - <br />4 ------------I <br />431 <br />0 020 <br />I <br />I 2 1-W. WAG I 169.38 I 4 733 0.035 I <br />I 3 I 0 O 0.000 I <br />I 4 I 0 I O I 0.000 I <br />5 I I 0 I O I 0.000 <br />6 I I 0 O 0.000 <br />I <br />I Total <br />2 I I <br />I ------- I <br />S I ----------- I <br />1,164 -- <br />I ----- I <br />0.055 I <br />----- <br />Fleet Total -------------- <br />0 - ------------- - <br />I ---------- - <br />77 I ----------- I--- <br />16,783 ------I <br />0.794 <br />Productivity and Cost --L TS REPL -E@92+00 FPC-lc2 <br />----Loader-------Hauled ----Hauler2- ---Potential Production--- <br />Qty & Model 9-637E I I TONS /Hour Avg MPH <br />BCY /Load ( 2,518 Lbs/HCY). 25.62 I <br />Hauler - Payload, TONS....... 32.25 I 1637E 1,471 14.7 I <br />- B of Max GVW ....... 94.9 I I <br />Load Time, Minutes .......... 1.00 I -------------------------- <br />------Hauler Cycle Time---------------- <br />I Load ........................ 1.00 I <br />I Haul ......................... 1.48 I <br />I Dump and Maneuver............ 0.60 I <br />Return ....................... 2.18 <br />Potential Cycle Time.. 5.26 <br />I Wait on Slow Hauler.......... <br />I Wait to Load.[Hunching-AVG ]. 0.00 <br />I Total Cycle Time...... 5.26 I <br />25-2-72 <br />----Operating Schedule---- <br />Operator Efficiency 8381 <br />Sched Hrs/Year 1,500 <br />Fleet Estimates------ <br />Fleet Availability 100.OBI <br />TONS /Sched Hr 1,221 I <br />Total TONS 21,124 I <br />Sched Hrs Reqd 17 <br />Total $ 16,783 I <br />$ per TON 0.794 I <br />TONS /Year 1,830,859 <br />Years Required 0.01 <br />Revised 04/01 <br />