My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121104
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:35 PM
Creation date
11/25/2007 9:04:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000080
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT A LEGAL DESCRIPTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 arnhart Agency, Tnc. <br />N ~ 212 West 13th Street <br />Pueblo, CO 81003 • Fax (719) 543-1329 • Ph: (719) 543-1324 <br />July 7, 2000 <br />REC ~ Ep <br />JUL '~ 2000 <br />Mr. Al Sibson Division of Minerals and Geology <br />IREA <br />5496 N. Hwy 85 <br />Sedalia, CO 80135 <br />Re: Mined Land Reclamation Board Gravel Pit Application <br />Pioneer Farm -Pioneer Sand <br />Dear Mr. Sibson <br />Pioneer Sand, Inc. is applying for a gravel mining permit from the Mined Land Reclamation <br />Boazd for a permit on property located (South 1/2, Section 34, Township 4 South, Range 64 <br />West of the 6th P.M.). IREA has an easement on the eastern edge of property. <br />We will be crossing the southern end of the easement with our haul road. <br />(See enclosed map). <br />The Rules and Regulations of the Colorado Mined Land Reclamation Board effective January <br />1996 in 6.4.19 Exhibit S -Permanent Man-Made Structures reads as follows: <br />"Where the mining operation will adversely affect the stability of any significant, valuable or <br />permanent man-made structure located within two hundred (200) feet of affected land, the <br />applicant may either: <br />(a) provide a notarized agreement between the applicant and the person(s) having an interest in <br />the structure, that the applicant is to provide compensation for any damage to the structure; or <br />(b) where such an agreement cannot be reached, the applicant shall provide an appropriate <br />engineering evaluation that demonstrates that such structure shall not be damaged by activities <br />occurring at [he mining operation." <br />"Your Brand of People" <br />
The URL can be used to link to this page
Your browser does not support the video tag.