My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121104
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:35 PM
Creation date
11/25/2007 9:04:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000080
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT A LEGAL DESCRIPTION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~ <br />~ ~~~ <br />M1IINED LAND M11'1LDLIFE QUESTIONNAIRE <br />for limited impact and select regular mine applications <br />NaineofCompany/Mine: Robert A. Grimm/ pioneer Farm <br />Name/Address/Phone of Con[act Person: J. R. Phillips, 1203 Sherman, Canon Cit <br />81212, Phone: (719) 275-6768 <br />CO <br />i. Location ofMine:~~^^^r,^^ ,. South 1/2 Section 39 T45 R64w 6th PP' <br />(County. Township. Ran~~~e, Section [ nearest quarter quarter; Exhibit A-M11LR appl.) <br />4.. Nearest To+vn/GeneralLocatidn: Southeast of Watkins <br />5. Land Ownership (circle I. Private 2. BLM 3. USFS 4. Other <br />6. Present Land Use: Cro land <br />7. Proposed Final Land Use: Cropland «~"°~- <br />8. Type of Operation: 1. Surface 2. Underground <br />flivisian of Minerals and Geology <br />9. Minerals being mined:~and F, rnncni t <br />10. Number and Description of Surface Acres Disturbed by Mining not including roads <br />(Exhibit D-MLR): 315 Acres total, with 36 acres Max. dt.crnrIled at anY time. <br />1 1. Miles of roads to be constructed: <br />12. Life of A4ine (years) <br />13. Description of Operation and Reclamation -Additional sheets may be Attached <br />(Exhibits B &: E -MLR) <br />This will be a low-to-medium volume operation with a maximum of 30 000 ions per <br />year of sand being produced. Topsoil will be stockpiled on the pit perimeters for <br />in reclamation, as well as helping to restrict visibility of the operation. <br />Aiinirg will proceed from West to East in 5 to 12-acre increments. Durin{{ farm <br />tPVPt; ng x Pxr^.^r; nn ^r r;vr; ~~ com m^ "^ls may be screened to provide an <br />enhanced product for use on the farm, or may be transported elsewhere. When <br />excavation of one of these incremental areas is completed the successive area <br />will be strioped to orovide growth medium and overburden for leveling the previous <br />area, and will be seeded wi[h an SCS recommended seed mix. <br />14. Please enclose ivlaps of Project Operation, Disturbance Areas and Reclamation (Exhibit C) <br />This will expedite processing. four cooperation is appreciated. <br />f - / t !~,~ ~ r / / <br />1 i. Prepared by .; .~=F ~I ; ' ;=~ .: ~ ~ f;;;.,,~.~ii~ . Datr. ~ mP R, 7000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.