Laserfiche WebLink
<br />Exhibit - D Reclamation Plan <br />The ultimate goal of the reclamation of the site will be to return <br />the area to usable rangeland, the pre-mining use. This goal is <br />very compatible with the contour plan as depicted in Exhibit E <br />(maps). The mining of this area should in no way hamper the end <br />use of the land. As the area was extremely steep prior to this <br />project we expect more usable rangeland will be created by this <br />project. <br />To the extent possible the final slopes will be developed during <br />the extraction process bringing the area to final contour in the <br />exhausted areas. As no overburden, or waste material is present <br />the only thing remaining at the end of extraction will be the <br />stockpiled topsoil. As shown on the map(s) the area will be <br />totally reclaimed at the end of the extraction phase. If necessary <br />at final contour benches will be cut into the long slopes to avoid <br />any rill erosion produced by long runoff paths. All final slopes <br />will be graded to gradients of slope no greater than 4:1. After <br />the final contours are finished the stockpiled topsoil will be <br />distributed across the area. It is expected that sufficient <br />stockpiled material will exist to distribute a minimum of 6 inches <br />of topsoil across the entire area. If not material will be <br />imported to make up any deficiency. Fertilizer and seeds will <br />then be applied. This process will be accomplished per the <br />recommendations of the Soil Conservation Service. <br />The estimated co <br />are as follows: <br />TOPSOILING - <br />SEEDING - <br />MULCHING - <br />FERTILIZING <br />st associated with the reclamation of this site <br />2 hours/acre at $55/hr $660 <br />$75/acre $450 <br />$95/acre $570 <br />- $65/acre $390 <br />Total $ 2070 <br />All reclamation will be done with equipment owned and operated by E1 <br />Paso County DOT. <br />